Optimization of Tubing and Pump Installation Parameters of Fractured Horizontal Wells in Shale Gas Reservoirs: Method and Case study

Abstract Shale gas wells often experience severe wellbore liquid accumulation during mid-to-late production period, leading to a sharp decline in gas production rate as the capacity of liquid-carrying decreases. Installing tubing or pumps can effectively mitigate these losses. However, how to determine the timing and depth of tubing or pump installation remains challenging due to variations in liquid loading along the horizontal wellbore. To fill this gap, an integrated transient multiphase flow model was established coupling the wellbore and reservoir to optimization of tubing and pump installation parameters of fractured horizontal wells in shale gas reservoirs. Three production scenarios are simulated, including casing production, tubing production, and pump-assisted production. History matching results show that the bottom-hole pressure, liquid production rates, and gas production rates match well. Besides, too early installation of tubing may reduce gas productivity significantly. Installing pump as soon as liquid loading occurs in a shale gas well can enhance its liquid-carrying capacity, thereby increasing cumulative gas production rates. Compared to installation on 60th or 160th day, installing the pump on 80th day yields better performance and increases cumulative gas production rates. Besides, pump-assisted production increased cumulative gas production by 16.5% compared to tubing production, and by 20.5% compared to casing production. This study provides a theoretical basis for optimizing the placement location and timing of pump installation in shale gas wells, aimed at reducing production losses due to liquid loading.

Authors

Institutions

Publication Details

Journal
Journal of energy resources technology.
Published
2026-04-27
DOI
https://doi.org/10.1115/1.4071754
Primary Topic
Hydraulic Fracturing and Reservoir Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Tubing and Pump Installation Parameters of Fractured Horizontal Wells in Shale Gas Reservoirs: Method and Case study

Kairui Ye, Jiazheng Qin, Yan Qu, Yong Tang et al.
Journal of energy resources technology.
Hydraulic Fracturing and Reservoir Analysis
article

Optimization of Tubing and Pump Installation Parameters of Fractured Horizontal Wells in Shale Gas Reservoirs: Method and Case study

Kairui Ye, Jiazheng Qin, Yan Qu, Yong Tang, Yi Li
article en

Abstract

Abstract Shale gas wells often experience severe wellbore liquid accumulation during mid-to-late production period, leading to a sharp decline in gas production rate as the capacity of liquid-carrying decreases. Installing tubing or pumps can effectively mitigate these losses. However, how to determine the timing and depth of tubing or pump installation remains challenging due to variations in liquid loading along the horizontal wellbore. To fill this gap, an integrated transient multiphase flow model was established coupling the wellbore and reservoir to optimization of tubing and pump installation parameters of fractured horizontal wells in shale gas reservoirs. Three production scenarios are simulated, including casing production, tubing production, and pump-assisted production. History matching results show that the bottom-hole pressure, liquid production rates, and gas production rates match well. Besides, too early installation of tubing may reduce gas productivity significantly. Installing pump as soon as liquid loading occurs in a shale gas well can enhance its liquid-carrying capacity, thereby increasing cumulative gas production rates. Compared to installation on 60th or 160th day, installing the pump on 80th day yields better performance and increases cumulative gas production rates. Besides, pump-assisted production increased cumulative gas production by 16.5% compared to tubing production, and by 20.5% compared to casing production. This study provides a theoretical basis for optimizing the placement location and timing of pump installation in shale gas wells, aimed at reducing production losses due to liquid loading.

Journal of energy resources technology.
Xihua University (CN), Chengdu Medical College (CN), Chenguang Research Institute of Chemical Industry (CN), Chengdu University (CN)
Openalex Percentile: Top 7%
Hydraulic Fracturing and Reservoir Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.