A Dual-Layer Cooperative Feedback Control Method with Improved DBO-PID for Managed Pressure Drilling: Two-Phase Flow Experimental Verification

During managed pressure drilling (MPD), gas influx intensifies the nonlinear relationship between choke valve opening degree and wellhead back pressure, causing conventional PID controllers to suffer from prolonged settling time and excessive overshoot. This paper proposes an automatic wellhead back pressure control method based on pressure–opening degree dual-layer cooperative feedback. The outer layer rapidly positions the choke valve near the target opening degree through a pressure drop–opening degree mapping model. The inner layer employs a PID controller tuned by an improved Dung Beetle Optimizer (DBO) for fine pressure regulation. The improved DBO introduces Logistic chaotic map initialization and an adaptive inertia weight to enhance global search capability, and adopts a comprehensive fitness function integrating the ITAE criterion with engineering safety constraints. Simulation results show that, compared with the Ziegler–Nichols (Z-N) method, the improved DBO-tuned PID reduces overshoot by 83.9% and settling time by 78.0%. Gas–liquid two-phase flow laboratory experiments were conducted with gas void fractions of 0–46.6%. Using manual control (average settling time of 50 s) as the benchmark, the dual-layer system equipped with the improved DBO-PID reduces settling time to 25 s (a 50% reduction), maximum overshoot absolute error to 0.009 MPa (a 74% reduction compared with Z-N-tuned PID), and achieves a mean absolute error of 0.004 MPa during continuous pressure tracking with zero overshoot. Both simulation and experimental results confirm that the synergy between the dual-layer control architecture and the improved DBO-PID enables rapid regulation and stable tracking of wellhead back pressure under gas–liquid two-phase flow conditions.

Authors

Institutions

Publication Details

Journal
Processes
Published
2026-04-27
DOI
https://doi.org/10.3390/pr14091394
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Dual-Layer Cooperative Feedback Control Method with Improved DBO-PID for Managed Pressure Drilling: Two-Phase Flow Experimental Verification

Zhenyu Long, Xing Shi, Hongwei Yang, Jun Li et al.
Processes
Drilling and Well Engineering
article

A Dual-Layer Cooperative Feedback Control Method with Improved DBO-PID for Managed Pressure Drilling: Two-Phase Flow Experimental Verification

Zhenyu Long, Xing Shi, Hongwei Yang, Jun Li, Wang Chen
article en

Abstract

During managed pressure drilling (MPD), gas influx intensifies the nonlinear relationship between choke valve opening degree and wellhead back pressure, causing conventional PID controllers to suffer from prolonged settling time and excessive overshoot. This paper proposes an automatic wellhead back pressure control method based on pressure–opening degree dual-layer cooperative feedback. The outer layer rapidly positions the choke valve near the target opening degree through a pressure drop–opening degree mapping model. The inner layer employs a PID controller tuned by an improved Dung Beetle Optimizer (DBO) for fine pressure regulation. The improved DBO introduces Logistic chaotic map initialization and an adaptive inertia weight to enhance global search capability, and adopts a comprehensive fitness function integrating the ITAE criterion with engineering safety constraints. Simulation results show that, compared with the Ziegler–Nichols (Z-N) method, the improved DBO-tuned PID reduces overshoot by 83.9% and settling time by 78.0%. Gas–liquid two-phase flow laboratory experiments were conducted with gas void fractions of 0–46.6%. Using manual control (average settling time of 50 s) as the benchmark, the dual-layer system equipped with the improved DBO-PID reduces settling time to 25 s (a 50% reduction), maximum overshoot absolute error to 0.009 MPa (a 74% reduction compared with Z-N-tuned PID), and achieves a mean absolute error of 0.004 MPa during continuous pressure tracking with zero overshoot. Both simulation and experimental results confirm that the synergy between the dual-layer control architecture and the improved DBO-PID enables rapid regulation and stable tracking of wellhead back pressure under gas–liquid two-phase flow conditions.

ProcessesVol. 14(9)
China University of Petroleum, Beijing (CN)
National Natural Science Foundation of China, National Science and Technology Major Project, National Key Research and Development Program of China
Openalex Percentile: Top 6%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.