Event-Driven Model and Adaptive Reconfiguration Mechanism of Construction Project Lifecycle under Wartime Uncertainty

This paper proposes an event-driven model of wartime uncertainty and an adaptive reconfiguration mechanism for the lifecycle of construction projects. In contrast to traditional approaches that treat uncertainty as parametric deviations, the proposed framework interprets external impacts as discrete events that may affect both the parameter state and the structural configuration of the project lifecycle. The event model enables a unified description of different types of disruptions, including physical damage, resource loss, logistical interruptions, financial constraints, and regulatory changes. Based on this representation, an adaptive mechanism is developed to update the set of admissible transitions and maintain feasible project trajectories under changing conditions. The decision-making process is formalized through an objective function that allows selecting the most appropriate transition between states after an event occurs. The proposed approach provides a basis for adaptive control of construction project lifecycles and can be applied in decision support systems for project management in unstable environments.

Authors

Institutions

Publication Details

Journal
Lighting Engineering & Power Engineering
Published
2026-04-24
DOI
https://doi.org/10.33042/2079-424x.2026.65.1.03
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Event-Driven Model and Adaptive Reconfiguration Mechanism of Construction Project Lifecycle under Wartime Uncertainty

Sergiy Kadatskyy
Lighting Engineering & Power Engineering
Resource-Constrained Project Scheduling
article

Event-Driven Model and Adaptive Reconfiguration Mechanism of Construction Project Lifecycle under Wartime Uncertainty

Sergiy Kadatskyy
article en

Abstract

This paper proposes an event-driven model of wartime uncertainty and an adaptive reconfiguration mechanism for the lifecycle of construction projects. In contrast to traditional approaches that treat uncertainty as parametric deviations, the proposed framework interprets external impacts as discrete events that may affect both the parameter state and the structural configuration of the project lifecycle. The event model enables a unified description of different types of disruptions, including physical damage, resource loss, logistical interruptions, financial constraints, and regulatory changes. Based on this representation, an adaptive mechanism is developed to update the set of admissible transitions and maintain feasible project trajectories under changing conditions. The decision-making process is formalized through an objective function that allows selecting the most appropriate transition between states after an event occurs. The proposed approach provides a basis for adaptive control of construction project lifecycles and can be applied in decision support systems for project management in unstable environments.

Lighting Engineering & Power Engineering
O.M. Beketov National University of Urban Economy in Kharkiv (UA)
Openalex Percentile: Top 11%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.