Modelling the Structural Drivers of Rework in Construction Projects: An Integrated Structural Equation Modelling Approach

Rework continues to be a critical issue in construction projects, contributing to cost escalation, schedule delays, and compromised quality. While earlier studies have identified isolated causes such as design deficiencies, communication failures, and inadequate workmanship, the structural relationships among these factors have not been sufficiently examined. This study investigates the interdependencies among major rework causation domains using Structural Equation Modelling (SEM) based on survey responses from 200 construction professionals. A total of 43 observed variables, identified through an extensive literature review, were grouped into four latent constructs: contractor-related, owner-related, design-related, and resource/workforce-related factors. Confirmatory Factor Analysis (CFA) was conducted to validate the measurement model, followed by structural path analysis to examine causal linkages. The findings reveal that design-related and owner-related factors exert the most significant direct and indirect influence on rework, followed by contractor- and workforce-related factors. The proposed model demonstrates satisfactory goodness-of-fit indices, confirming its reliability and applicability. Compared to conventional ranking and fuzzy-based approaches, SEM provides a more systematic and comprehensive understanding of rework dynamics. The findings provide practical guidance for project managers and decision-makers by identifying the most critical drivers of rework, enabling targeted mitigation strategies and improved resource allocation to enhance overall construction project performance.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-04-17
DOI
https://doi.org/10.3390/buildings16081590
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modelling the Structural Drivers of Rework in Construction Projects: An Integrated Structural Equation Modelling Approach

Murat Gündüz, Mina Daneshvar, Khalid K. Naji
Buildings
Construction Project Management and Performance
article

Modelling the Structural Drivers of Rework in Construction Projects: An Integrated Structural Equation Modelling Approach

Murat Gündüz, Mina Daneshvar, Khalid K. Naji
article en

Abstract

Rework continues to be a critical issue in construction projects, contributing to cost escalation, schedule delays, and compromised quality. While earlier studies have identified isolated causes such as design deficiencies, communication failures, and inadequate workmanship, the structural relationships among these factors have not been sufficiently examined. This study investigates the interdependencies among major rework causation domains using Structural Equation Modelling (SEM) based on survey responses from 200 construction professionals. A total of 43 observed variables, identified through an extensive literature review, were grouped into four latent constructs: contractor-related, owner-related, design-related, and resource/workforce-related factors. Confirmatory Factor Analysis (CFA) was conducted to validate the measurement model, followed by structural path analysis to examine causal linkages. The findings reveal that design-related and owner-related factors exert the most significant direct and indirect influence on rework, followed by contractor- and workforce-related factors. The proposed model demonstrates satisfactory goodness-of-fit indices, confirming its reliability and applicability. Compared to conventional ranking and fuzzy-based approaches, SEM provides a more systematic and comprehensive understanding of rework dynamics. The findings provide practical guidance for project managers and decision-makers by identifying the most critical drivers of rework, enabling targeted mitigation strategies and improved resource allocation to enhance overall construction project performance.

BuildingsVol. 16(8)
Qatar University (QA)
Openalex Percentile: Top 18%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.