An integrated MCDM-Simulation approach to study the effect of lot-splitting in a large-scale assembly job shop: a case study

The impact of lot-splitting on performance measures of the assembly job shop has been investigated in this study. The problem considered in this study includes 10 different products comprising 149 components, with 14 to 16 components in each product. Every component undergoes 1 to 8 operations. A total of 206 operations is to be completed using 28 machines. Discrete Event Simulation (DES) models were developed considering static and dynamic job arrival scenarios to evaluate makespan, mean flowtime and tardiness. TOPSIS-based MCDM with different normalization procedures is proposed to prioritize jobs. The performance of MCDMs is compared with the known priority rules in the literature. Among the normalization techniques, the linear normalization (Max-Min) achieves the best results for minimizing mean flowtime and mean tardiness. The linear normalization (Max) variant is the most effective in reducing maximum tardiness. Lot splitting resulted in improved makespan, mean flowtime and tardiness by 16%, 20% and 39%, respectively. Statistical analysis using ANOVA and Tukey’s HSD tests was conducted to analyze the significance of the results produced by the proposed MCDMs.

Authors

Institutions

Publication Details

Journal
The International Journal of Advanced Manufacturing Technology
Published
2026-04-16
DOI
https://doi.org/10.1007/s00170-026-18015-7
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An integrated MCDM-Simulation approach to study the effect of lot-splitting in a large-scale assembly job shop: a case study

Olivia McDermott, Rameshkumar Krishnaswamy, Sudeesh Sudevan, Thenarasu Mohanavelu
The International Journal of Advanced Manufacturing Technology
Advanced Manufacturing and Logistics Optimization
article

An integrated MCDM-Simulation approach to study the effect of lot-splitting in a large-scale assembly job shop: a case study

Olivia McDermott, Rameshkumar Krishnaswamy, Sudeesh Sudevan, Thenarasu Mohanavelu
article en

Abstract

The impact of lot-splitting on performance measures of the assembly job shop has been investigated in this study. The problem considered in this study includes 10 different products comprising 149 components, with 14 to 16 components in each product. Every component undergoes 1 to 8 operations. A total of 206 operations is to be completed using 28 machines. Discrete Event Simulation (DES) models were developed considering static and dynamic job arrival scenarios to evaluate makespan, mean flowtime and tardiness. TOPSIS-based MCDM with different normalization procedures is proposed to prioritize jobs. The performance of MCDMs is compared with the known priority rules in the literature. Among the normalization techniques, the linear normalization (Max-Min) achieves the best results for minimizing mean flowtime and mean tardiness. The linear normalization (Max) variant is the most effective in reducing maximum tardiness. Lot splitting resulted in improved makespan, mean flowtime and tardiness by 16%, 20% and 39%, respectively. Statistical analysis using ANOVA and Tukey’s HSD tests was conducted to analyze the significance of the results produced by the proposed MCDMs.

The International Journal of Advanced Manufacturing Technology
Ollscoil na Gaillimhe – University of Galway (IE), Amrita Vishwa Vidyapeetham (IN)
Decent work and economic growth
Openalex Percentile: Top 12%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.