Standard analytical data from water analyses Metadata

The primary objective of the measurements was to verify the operation of the water treatment testing facility. This involved identifying potential operational issues early, verifying equipment functionality, and fine-tuning operational, sampling, and maintenance protocols. These steps were essential to promptly initiate the long-term sorption tests, which are critical to the project’s success and whose duration should be maximized to ensure comprehensive results. The setup served as a precise simulation of a future scenario in which 25% of the water treatment plant’s sand filters would be replaced with GAU. In this configuration, raw water is first processed through the remaining 75% of the sand filters before being subjected to GAU filtration as a final treatment step. Three different types of GAU were tested: Hydraffin CC 8x30 was used in Column A, Filtrasorb TL 830 in Column B, and Aquasorb 5005 in Column C. Pilot testing commenced during the first year of the project on June 16, 2024, and continued throughout 2025 under the same operational framework.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-04-10
DOI
https://doi.org/10.5281/zenodo.19496994
Primary Topic
Environmental and Sediment Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Standard analytical data from water analyses Metadata

Marek Šváb, Michael Pohořelý, Marek Skalický, Martina Švábová
Zenodo (CERN European Organization for Nuclear Research)
Environmental and Sediment Control
article

Standard analytical data from water analyses Metadata

Marek Šváb, Michael Pohořelý, Marek Skalický, Martina Švábová
article en

Abstract

The primary objective of the measurements was to verify the operation of the water treatment testing facility. This involved identifying potential operational issues early, verifying equipment functionality, and fine-tuning operational, sampling, and maintenance protocols. These steps were essential to promptly initiate the long-term sorption tests, which are critical to the project’s success and whose duration should be maximized to ensure comprehensive results. The setup served as a precise simulation of a future scenario in which 25% of the water treatment plant’s sand filters would be replaced with GAU. In this configuration, raw water is first processed through the remaining 75% of the sand filters before being subjected to GAU filtration as a final treatment step. Three different types of GAU were tested: Hydraffin CC 8x30 was used in Column A, Filtrasorb TL 830 in Column B, and Aquasorb 5005 in Column C. Pilot testing commenced during the first year of the project on June 16, 2024, and continued throughout 2025 under the same operational framework.

Zenodo (CERN European Organization for Nuclear Research)
Czech Academy of Sciences, Institute of Rock Structure and Mechanics (CZ), Vodárna Káraný (Czechia) (CZ), Dekonta (Czechia) (CZ), Innovations for Heart and Vessels (Poland) (PL), University of Chemistry and Technology, Prague (CZ)
Clean water and sanitation
Openalex Percentile: Top 10%
Environmental and Sediment Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.