Assessment of Allowable Operational Limits for Floating Spar Wind Turbine Installations

The installation of floating offshore wind turbines presents significant operational challenges due to coupled vessel platform dynamics and sensitivity to environmental conditions. This study proposes a response-based methodology for defining allowable operational limits and assessing operability for floating wind turbine generator (WTG) installation using the Nordic Wind concept. The approach integrates hydrodynamic modelling, time-domain simulations, and probabilistic weather-window analysis to evaluate installation feasibility under realistic offshore conditions. The methodology explicitly accounts for coupled vessel spar interactions, heading-dependent system response, and response-based failure criteria, including relative motion, gripper forces, and impact velocity. Allowable sea-state limits are derived for key installation phases and applied to multiple case studies representing different geographical locations and project scales. The results show that installation operability is governed primarily by system response rather than environmental parameters alone. Peak wave period and wave heading are identified as dominant factors, with longer wave periods leading to reduced operability due to response amplification. Across all case studies, the mating phase is found to be the most restrictive operation, controlling overall installation feasibility. Head sea conditions generally provide improved operability, while following seas lead to increased relative motion and reduced performance. The comparative analysis further demonstrates that environmental severity and project scale jointly influence installation duration. Milder environments result in higher operability, whereas harsher conditions, particularly those characterised by long-period swell, significantly reduce feasible weather windows. Larger installation campaigns increase cumulative exposure to weather downtime, even under favourable conditions. The proposed framework extends existing operability assessment methods by incorporating coupled multi-body dynamics and response-based criteria specific to floating wind installations. The results provide a quantitative basis for defining operational limits and support improved planning and decision making for offshore wind turbine installation.

Authors

Institutions

Publication Details

Journal
Journal of Marine Science and Engineering
Published
2026-04-14
DOI
https://doi.org/10.3390/jmse14080723
Primary Topic
Wave and Wind Energy Systems
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessment of Allowable Operational Limits for Floating Spar Wind Turbine Installations

C Soares, Mohamed Hassan
Journal of Marine Science and Engineering
Wave and Wind Energy Systems
article

Assessment of Allowable Operational Limits for Floating Spar Wind Turbine Installations

C Soares, Mohamed Hassan
article en

Abstract

The installation of floating offshore wind turbines presents significant operational challenges due to coupled vessel platform dynamics and sensitivity to environmental conditions. This study proposes a response-based methodology for defining allowable operational limits and assessing operability for floating wind turbine generator (WTG) installation using the Nordic Wind concept. The approach integrates hydrodynamic modelling, time-domain simulations, and probabilistic weather-window analysis to evaluate installation feasibility under realistic offshore conditions. The methodology explicitly accounts for coupled vessel spar interactions, heading-dependent system response, and response-based failure criteria, including relative motion, gripper forces, and impact velocity. Allowable sea-state limits are derived for key installation phases and applied to multiple case studies representing different geographical locations and project scales. The results show that installation operability is governed primarily by system response rather than environmental parameters alone. Peak wave period and wave heading are identified as dominant factors, with longer wave periods leading to reduced operability due to response amplification. Across all case studies, the mating phase is found to be the most restrictive operation, controlling overall installation feasibility. Head sea conditions generally provide improved operability, while following seas lead to increased relative motion and reduced performance. The comparative analysis further demonstrates that environmental severity and project scale jointly influence installation duration. Milder environments result in higher operability, whereas harsher conditions, particularly those characterised by long-period swell, significantly reduce feasible weather windows. Larger installation campaigns increase cumulative exposure to weather downtime, even under favourable conditions. The proposed framework extends existing operability assessment methods by incorporating coupled multi-body dynamics and response-based criteria specific to floating wind installations. The results provide a quantitative basis for defining operational limits and support improved planning and decision making for offshore wind turbine installation.

Journal of Marine Science and EngineeringVol. 14(8)
University of Lisbon (PT)
Fundação para a Ciência e a Tecnologia
Affordable and clean energy
Openalex Percentile: Top 23%
Wave and Wind Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.