Construction duration prediction for ultra-high-rise buildings using PCA and an improved sparrow-search–optimized BPNN
Construction duration prediction is crucial for the early-stage planning of ultra-high-rise building (UHRB) projects, but its accuracy is often limited by high-dimensional, strongly correlated, and mixed-type engineering features. To overcome these issues, this study develops a hybrid PCA-ISSA-BPNN framework that combines principal component analysis (PCA), an improved sparrow search algorithm enhanced with grey wolf optimization (ISSA), and a back-propagation neural network (BPNN). PCA is used to reduce multicollinearity and redundancy in the quantitative variables, while ISSA performs global hyperparameter optimization for the BPNN. Based on 87 UHRB projects and five-fold cross-validation, the proposed model achieved the best predictive performance among all compared methods, with $$\:{R}^{2}=0.982$$, RMSE = 23.496, MAE = 15.742, and MAPE = 2.0%. These results demonstrate that the proposed framework can simultaneously improve accuracy, robustness, and feature representation quality. The PCA-ISSA-BPNN model therefore provides a practical and effective tool for early-stage duration estimation and schedule-risk screening in UHRB projects.
Authors
- Yongqi Liu (ORCID: https://orcid.org/0000-0002-3235-7325)
- Xu Feng
- Xian-chao Yang
- Wen-tong Lyu
- Pei-juan Zheng
- Hou-jun Li
- Rony Badhon Roy
- Fei-yang Yuan
Institutions
- Hunan University of Science and Technology (CN)
- Universiti Sains Malaysia (MY)
- Zhejiang Tongji Vocational College of Science and Technology (CN)
- Hunan Institute of Technology (CN)
Publication Details
- Journal
- Scientific Reports
- Published
- 2026-04-13
- DOI
- https://doi.org/10.1038/s41598-026-48646-5
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00