AI4Deliberation_D5.1 - Pilots plan, operation and evaluation

The present deliverable D5.1: Pilots plan, operation and evaluation – first sprint constitutes the first reporting iteration of Work Package 5 (WP5). It documents the outcomes of the "First Sprint" (M7-M15) and contributes directly to the fulfilment of the primary objectives of WP5: O5.1: To construct a model for evaluating acceptance and trust, specifically for AI deliberations, and devise a method to evaluate usability. O5.2: To develop a concrete evaluation plan for each pilot site. O5.3: To pilot results in real-life scenarios (focusing in this sprint on internal validation and infrastructure readiness). The aim of the deliverable is to (a) present the detailed context and operational planning for the four pilot sites, defining their transition to AI-enabled processes, and (b) to establish the evaluation methodology and report the results of the initial internal testing of the project’s socio-technical infrastructure.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-07-16
DOI
https://doi.org/10.5281/zenodo.19542105
Primary Topic
Persona Design and Applications
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

AI4Deliberation_D5.1 - Pilots plan, operation and evaluation

Dimitris Zeginis
Zenodo (CERN European Organization for Nuclear Research)
Persona Design and Applications
article

AI4Deliberation_D5.1 - Pilots plan, operation and evaluation

Dimitris Zeginis
article en

Abstract

The present deliverable D5.1: Pilots plan, operation and evaluation – first sprint constitutes the first reporting iteration of Work Package 5 (WP5). It documents the outcomes of the "First Sprint" (M7-M15) and contributes directly to the fulfilment of the primary objectives of WP5: O5.1: To construct a model for evaluating acceptance and trust, specifically for AI deliberations, and devise a method to evaluate usability. O5.2: To develop a concrete evaluation plan for each pilot site. O5.3: To pilot results in real-life scenarios (focusing in this sprint on internal validation and infrastructure readiness). The aim of the deliverable is to (a) present the detailed context and operational planning for the four pilot sites, defining their transition to AI-enabled processes, and (b) to establish the evaluation methodology and report the results of the initial internal testing of the project’s socio-technical infrastructure.

Zenodo (CERN European Organization for Nuclear Research)
Centre for Research and Technology Hellas (GR)
European Commission
Industry, innovation and infrastructure
Openalex Percentile: Top 57%
Persona Design and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.