Automated design of heuristics for resource-constrained project scheduling problem via regression algorithms

Abstract The resource-constrained project scheduling problem (RCPSP) is a complex optimization problem aiming to construct feasible schedules that minimize the project makespan while satisfying the precedence and renewable resource constraints. Priority rule heuristics are prevalent approaches for solving the RCPSP, particularly in practical applications. However, these rules are problem-specific, and no rule can consistently outperform others across different projects. Designing priority rules through manual methods requires substantial expertise, time, and computational effort. This has led researchers to propose automated techniques for this purpose. Most existing research in this area focuses on unsupervised learning techniques like genetic programming hyper-heuristics (GPHH), while the investigation of supervised learning algorithms remains limited. To address this gap, this research explores the potential of supervised learning algorithms, specifically regression-based methods, for the automated design of new priority rule heuristics for RCPSP. Nine widely used regression algorithms were evaluated, and the top-performing three were further enhanced using ensemble techniques to augment their effectiveness. Computational experiments show that regression-based heuristics can outperform traditional priority rules across all primary test datasets and, in some cases, even surpass priority rules designed through GPHH. To further validate the reliability of our results, we also tested the regression-based heuristics on various supplementary datasets, including project instances with more than 1,000 activities and empirical projects. Their performance highlights the robust generalization of regression-based heuristics.

Authors

Institutions

Publication Details

Journal
Annals of Operations Research
Published
2026-04-11
DOI
https://doi.org/10.1007/s10479-026-07196-9
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Automated design of heuristics for resource-constrained project scheduling problem via regression algorithms

Jun Luo, Mario Vanhoucke, Jie Song, José P. Coelho
Annals of Operations Research
Resource-Constrained Project Scheduling
article

Automated design of heuristics for resource-constrained project scheduling problem via regression algorithms

Jun Luo, Mario Vanhoucke, Jie Song, José P. Coelho
article en

Abstract

Abstract The resource-constrained project scheduling problem (RCPSP) is a complex optimization problem aiming to construct feasible schedules that minimize the project makespan while satisfying the precedence and renewable resource constraints. Priority rule heuristics are prevalent approaches for solving the RCPSP, particularly in practical applications. However, these rules are problem-specific, and no rule can consistently outperform others across different projects. Designing priority rules through manual methods requires substantial expertise, time, and computational effort. This has led researchers to propose automated techniques for this purpose. Most existing research in this area focuses on unsupervised learning techniques like genetic programming hyper-heuristics (GPHH), while the investigation of supervised learning algorithms remains limited. To address this gap, this research explores the potential of supervised learning algorithms, specifically regression-based methods, for the automated design of new priority rule heuristics for RCPSP. Nine widely used regression algorithms were evaluated, and the top-performing three were further enhanced using ensemble techniques to augment their effectiveness. Computational experiments show that regression-based heuristics can outperform traditional priority rules across all primary test datasets and, in some cases, even surpass priority rules designed through GPHH. To further validate the reliability of our results, we also tested the regression-based heuristics on various supplementary datasets, including project instances with more than 1,000 activities and empirical projects. Their performance highlights the robust generalization of regression-based heuristics.

Annals of Operations Research
Northwestern Polytechnical University (CN), Universidade Aberta (PT), Ghent University (BE), The London College (GB), Vlerick Business School (BE), INESC TEC (PT), University College London (GB), McGill University (CA)
Openalex Percentile: Top 19%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.