Budget Control in Hospital Construction with AI: A Lesson from Government Project

A practical playbook is outlined in this chapter to utilize auditable light AI to keep government hospital construction within budget. Three components are fed by a standard monthly data template: (1) threshold alerts (R/A/G for cost, time/schedule and contingency), (2) a small predictive model forecast of next month's overrun percentage using 5-7 fully transparent features, and (3) a single page dashboard plus a regular review rhythm. When applied to a 24-month hospital program, the approach was able to reduce average monthly overrun from 8.0% to 5.3%, move numerous packages from RED/AMBER to GREEN and stabilize contingency usage. The results show significant differences between what has been completed and what is still to be done, along with increasing changes in scope as the earliest warning signs of potential problems. This is an easily adopted, audited and robust to staff turnover on public project methodology.

Authors

Institutions

Publication Details

Journal
International Journal of Versatile Research and Analysis
Published
2026-04-01
DOI
https://doi.org/10.56975/ijvra.v4i4.703700
Primary Topic
Artificial Intelligence in Healthcare and Education
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Budget Control in Hospital Construction with AI: A Lesson from Government Project

Dr.G.Prasanna Kumar, P. V. S. Swamy, K. Siva
International Journal of Versatile Research and Analysis
Artificial Intelligence in Healthcare and Education
article

Budget Control in Hospital Construction with AI: A Lesson from Government Project

Dr.G.Prasanna Kumar, P. V. S. Swamy, K. Siva
article en

Abstract

A practical playbook is outlined in this chapter to utilize auditable light AI to keep government hospital construction within budget. Three components are fed by a standard monthly data template: (1) threshold alerts (R/A/G for cost, time/schedule and contingency), (2) a small predictive model forecast of next month's overrun percentage using 5-7 fully transparent features, and (3) a single page dashboard plus a regular review rhythm. When applied to a 24-month hospital program, the approach was able to reduce average monthly overrun from 8.0% to 5.3%, move numerous packages from RED/AMBER to GREEN and stabilize contingency usage. The results show significant differences between what has been completed and what is still to be done, along with increasing changes in scope as the earliest warning signs of potential problems. This is an easily adopted, audited and robust to staff turnover on public project methodology.

International Journal of Versatile Research and AnalysisVol. 4(4)
Acharya N. G. Ranga Agricultural University (IN)
Openalex Percentile: Top 8%
Artificial Intelligence in Healthcare and Education
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.