Minimizing bicriteria scheduling of two-component jobs on a bounded series-batching machine
Minimizing maximum cost and makespan simultaneously on a bounded series-batching machine is considered in the paper, in which each job contains a specific component and a standard component. Specific components are scheduled separately, while standard components are scheduled in batches. Completing a job means that its two components have been completed. Additionally, the two components nents of a job can be scheduled in any order. We present an O(n4)-time algorithm for the simultaneous optimization scheduling problem. When the maximum cost is the maximum lateness, time complexity of the algorithm is O(n3logn) time.
Authors
- Cheng He (ORCID: https://orcid.org/0000-0003-3329-8491)
- Cunchang Gu
- Xin Chai
- Yuan Zhang
- Hao Lin
Publication Details
- Journal
- Springer Link (Chiba Institute of Technology)
- Published
- 2026-06-09
- DOI
- https://doi.org/10.1051/ro/2026034/pdf
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 0.00