Factors of Uncertainty in Forecasting the Cost of Construction and Installation Works in Investment Construction Projects

The article addresses the issue of uncertainty in forecasting the cost of construction and installation works (CIW) in investment construction projects under conditions of high price volatility, regional market differentiation, organizational fragmentation of business processes, and insufficient formalization of pricing procedures. An analysis of external and internal factors affecting the accuracy of cost forecasts is carried out. Particular attention is given to macroeconomic, logistics-related, seasonal, design and technological, organizational and process-related, and information-based sources of uncertainty. A significant share of forecasting errors is caused not only by market volatility, but also by imperfections in baseline data, the subjectivity of expert assessments, weak coordination between departments, and the absence of a unified digital environment for cost formation. The purpose of the study is to identify and systematize uncertainty factors affecting the accuracy of forecasting the cost of construction and installation works, as well as to substantiate approaches to their reduction based on digitalization and the use of intelligent data analysis methods. The objectives of the study include analyzing the key uncertainty factors, comparing cost forecasting methods, and developing practical recommendations for improving forecast accuracy. The paper systematizes uncertainty factors by project life cycle stages and by levels of managerial influence. A comparison of traditional and intelligent cost forecasting methods is performed. The necessity of transitioning from classical cost estimation analysis to a digital cost management framework is substantiated. The practical significance of the study lies in the development of a set of recommendations aimed at reducing uncertainty in forecasting the cost of CIW, including the standardization of baseline data, improvement of the transparency of procedures for reviewing commercial proposals, digitalization of cost change approval processes, implementation of price monitoring systems, and the use of predictive analytics in the management of investment construction projects.

Authors

Institutions

Publication Details

Journal
Construction and Architecture
Published
2026-03-31
DOI
https://doi.org/10.29039/2308-0191-2026-14-1-c0030
Primary Topic
Information Systems and Technology Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Factors of Uncertainty in Forecasting the Cost of Construction and Installation Works in Investment Construction Projects

Vladimir Vladimirovich Filatov, Maksim Zheleznov, Angelina Rybakova, Alexsandr Kudryavtsev et al.
Construction and Architecture
Information Systems and Technology Applications
article

Factors of Uncertainty in Forecasting the Cost of Construction and Installation Works in Investment Construction Projects

Vladimir Vladimirovich Filatov, Maksim Zheleznov, Angelina Rybakova, Alexsandr Kudryavtsev, Lyubov' Adamcevich
article en

Abstract

The article addresses the issue of uncertainty in forecasting the cost of construction and installation works (CIW) in investment construction projects under conditions of high price volatility, regional market differentiation, organizational fragmentation of business processes, and insufficient formalization of pricing procedures. An analysis of external and internal factors affecting the accuracy of cost forecasts is carried out. Particular attention is given to macroeconomic, logistics-related, seasonal, design and technological, organizational and process-related, and information-based sources of uncertainty. A significant share of forecasting errors is caused not only by market volatility, but also by imperfections in baseline data, the subjectivity of expert assessments, weak coordination between departments, and the absence of a unified digital environment for cost formation. The purpose of the study is to identify and systematize uncertainty factors affecting the accuracy of forecasting the cost of construction and installation works, as well as to substantiate approaches to their reduction based on digitalization and the use of intelligent data analysis methods. The objectives of the study include analyzing the key uncertainty factors, comparing cost forecasting methods, and developing practical recommendations for improving forecast accuracy. The paper systematizes uncertainty factors by project life cycle stages and by levels of managerial influence. A comparison of traditional and intelligent cost forecasting methods is performed. The necessity of transitioning from classical cost estimation analysis to a digital cost management framework is substantiated. The practical significance of the study lies in the development of a set of recommendations aimed at reducing uncertainty in forecasting the cost of CIW, including the standardization of baseline data, improvement of the transparency of procedures for reviewing commercial proposals, digitalization of cost change approval processes, implementation of price monitoring systems, and the use of predictive analytics in the management of investment construction projects.

Construction and ArchitectureVol. 14(1)
Moscow State University of Civil Engineering (RU)
Responsible consumption and production
Openalex Percentile: Top 18%
Information Systems and Technology Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.