Exploring emerging barriers to BIM adoption for sustainable project tracking and control readiness in Saudi Arabia: an ISM-based approach

Purpose Although BIM has advanced globally, its implementation still faces resistance and practical challenges. This paper examines barriers to implementing building information modeling (BIM) for project tracking and control readiness from the perspectives of architectural/engineering (A/E) firms and contractors in Saudi Arabia. Design/methodology/approach Literature review was integrated with expert interviews. Two approaches were utilized for ranking barriers to BIM adoption for sustainable project tracking and control readiness. The first was the relative importance index (RII) to assess obstacles facing A/E firms and contractors. The second was the interpretive structural modeling (ISM) to analyze interdependence and key influencing barriers. Findings The top barriers for A/E firms were a lack of client demand, insufficient software skills, poor data quality, reliance on traditional practices, and budget constraints. For contractors, the main challenges included budget limitations, lack of client demand, inadequate software skills, early contractor involvement and project type. The ISM analysis highlighted incomplete adoption across stakeholders as a key dependent variable, driven by fundamental barriers. Practical implications This study points out the main barriers to adopting BIM as a new digital technology for tracking and controlling ongoing construction projects during the construction stage. Originality/value An integrated TOE–RII–ISM approach was proposed for identifying and prioritizing the key barriers to adopting BIM in project tracking and control, from two perspectives (A/E and Contractors). The findings offer valuable insights into current practices by providing a quantitative method that uses advanced models to determine the relationships among key barriers.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2026-04-02
DOI
https://doi.org/10.1108/ecam-07-2025-1157
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploring emerging barriers to BIM adoption for sustainable project tracking and control readiness in Saudi Arabia: an ISM-based approach

Awsan Mohammed, Mohammad A. Hassanain, Adel Alshibani, Mohamed Mudawi et al.
Engineering Construction & Architectural Management
BIM and Construction Integration
article

Exploring emerging barriers to BIM adoption for sustainable project tracking and control readiness in Saudi Arabia: an ISM-based approach

Awsan Mohammed, Mohammad A. Hassanain, Adel Alshibani, Mohamed Mudawi, Naji Osman
article en

Abstract

Purpose Although BIM has advanced globally, its implementation still faces resistance and practical challenges. This paper examines barriers to implementing building information modeling (BIM) for project tracking and control readiness from the perspectives of architectural/engineering (A/E) firms and contractors in Saudi Arabia. Design/methodology/approach Literature review was integrated with expert interviews. Two approaches were utilized for ranking barriers to BIM adoption for sustainable project tracking and control readiness. The first was the relative importance index (RII) to assess obstacles facing A/E firms and contractors. The second was the interpretive structural modeling (ISM) to analyze interdependence and key influencing barriers. Findings The top barriers for A/E firms were a lack of client demand, insufficient software skills, poor data quality, reliance on traditional practices, and budget constraints. For contractors, the main challenges included budget limitations, lack of client demand, inadequate software skills, early contractor involvement and project type. The ISM analysis highlighted incomplete adoption across stakeholders as a key dependent variable, driven by fundamental barriers. Practical implications This study points out the main barriers to adopting BIM as a new digital technology for tracking and controlling ongoing construction projects during the construction stage. Originality/value An integrated TOE–RII–ISM approach was proposed for identifying and prioritizing the key barriers to adopting BIM in project tracking and control, from two perspectives (A/E and Contractors). The findings offer valuable insights into current practices by providing a quantitative method that uses advanced models to determine the relationships among key barriers.

Engineering Construction & Architectural Management
King Fahd University of Petroleum and Minerals (SA)
Openalex Percentile: Top 32%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.