Mechanical design of high heat load front-end for IVU beamline at Korea-4GSR

The Korea-4GSR, to be built in Ochang, South Korea by 2030, is a new 4th generation synchrotron radiation facility. It is designed with an electron beam energy of 4 GeV, a stored electron beam current of 400 mA, and an emittance of 62 pm.rad. In Phase I, 10 beamlines will be constructed, five of which will use the IVU24 undulator. When the undulator gap is set to 5 mm, the X-ray source has a total power of 17.95 kW and peak power density of 165 kW/mrad². The High Heat Load Front-End(HHLFE) system is designed to absorb up to 17kW of heat using a fixed mask and a movable mask, ensuring that only the central cone is transmitted to the beamline optical devices. The main materials are GlidCop or CuCrZr, selected for their high thermal conductivity, and the cooling channels are designed with a rectangular cross-section to maximize the heat exchange area for efficient thermal management. In addition, tungsten is applied to precisely shape and effectively absorb the X-ray beam. The structural design of the heat-absorbing devices was determined based on thermal analysis results$*$. This presentation introduces the structural and mechanical design details of the HHLFE.

Authors

Publication Details

Journal
JACOW
Published
2026-04-02
DOI
https://doi.org/10.18429/jacow-medsi2025-wep44
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mechanical design of high heat load front-end for IVU beamline at Korea-4GSR

Young Duck Yun, Jehan Kim, Ki-Jeong Kim, Hyung-seok Choi et al.
JACOW
Particle Accelerators and Free-Electron Lasers
article

Mechanical design of high heat load front-end for IVU beamline at Korea-4GSR

Young Duck Yun, Jehan Kim, Ki-Jeong Kim, Hyung-seok Choi, Jongha Park, Sungnam Kim
article en

Abstract

The Korea-4GSR, to be built in Ochang, South Korea by 2030, is a new 4th generation synchrotron radiation facility. It is designed with an electron beam energy of 4 GeV, a stored electron beam current of 400 mA, and an emittance of 62 pm.rad. In Phase I, 10 beamlines will be constructed, five of which will use the IVU24 undulator. When the undulator gap is set to 5 mm, the X-ray source has a total power of 17.95 kW and peak power density of 165 kW/mrad². The High Heat Load Front-End(HHLFE) system is designed to absorb up to 17kW of heat using a fixed mask and a movable mask, ensuring that only the central cone is transmitted to the beamline optical devices. The main materials are GlidCop or CuCrZr, selected for their high thermal conductivity, and the cooling channels are designed with a rectangular cross-section to maximize the heat exchange area for efficient thermal management. In addition, tungsten is applied to precisely shape and effectively absorb the X-ray beam. The structural design of the heat-absorbing devices was determined based on thermal analysis results$*$. This presentation introduces the structural and mechanical design details of the HHLFE.

JACOW
Affordable and clean energy
Openalex Percentile: Top 5%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.