Verification of SPring-8-II vacuum system prototype chamber

The SPring-8-II project, upgrading SPring-8 to a 4th generation light source, started in FY2024. SPring-8 will shut down after summer 2027 for removal of existing equipment and installation of new accelerator components. User operation is scheduled to resume in spring 2029. The project requires a vacuum system compatible with compact, reduced-aperture magnets, ensuring sufficient beam lifetime and operational flexibility. An efficient pumping system was introduced for lifetime assurance, localizing photon-stimulated desorption gas near distributed absorbers and utilizing closely placed NEG pumps. A low coupling impedance vacuum system was designed by optimizing chamber geometry etc. to enable various operation modes. Prior to the mass production of vacuum components, prototypes of the main vacuum chambers were fabricated and their performance was verified with magnet arrays. These tests confirmed procedures for rapid installation and vacuum commissioning excluding in-situ baking after installation, checked for interference with other equipment, and verified vacuum performance. We present the design progress and prototype verification results for the SPring-8-II vacuum system.

Authors

Publication Details

Journal
JACOW
Published
2026-04-02
DOI
https://doi.org/10.18429/jacow-medsi2025-thp59
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Verification of SPring-8-II vacuum system prototype chamber

Mitsuhiro Masaki, Yosuke Ueda, Hideki Dewa, Takemasa Masuda et al.
JACOW
Particle Accelerators and Free-Electron Lasers
article

Verification of SPring-8-II vacuum system prototype chamber

Mitsuhiro Masaki, Yosuke Ueda, Hideki Dewa, Takemasa Masuda, M. Shoji, Hiroshi Ota, Masaya Oishi, Takahiro Watanabe, Kazuhiro Tamura, Shiro Takano, Yukiko Taniuchi
article en

Abstract

The SPring-8-II project, upgrading SPring-8 to a 4th generation light source, started in FY2024. SPring-8 will shut down after summer 2027 for removal of existing equipment and installation of new accelerator components. User operation is scheduled to resume in spring 2029. The project requires a vacuum system compatible with compact, reduced-aperture magnets, ensuring sufficient beam lifetime and operational flexibility. An efficient pumping system was introduced for lifetime assurance, localizing photon-stimulated desorption gas near distributed absorbers and utilizing closely placed NEG pumps. A low coupling impedance vacuum system was designed by optimizing chamber geometry etc. to enable various operation modes. Prior to the mass production of vacuum components, prototypes of the main vacuum chambers were fabricated and their performance was verified with magnet arrays. These tests confirmed procedures for rapid installation and vacuum commissioning excluding in-situ baking after installation, checked for interference with other equipment, and verified vacuum performance. We present the design progress and prototype verification results for the SPring-8-II vacuum system.

JACOW
Affordable and clean energy
Openalex Percentile: Top 6%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.