Commissioning of the APS-Upgrade storage ring vacuum system

The APS-Upgrade Project (APS-U) built a new electron 1100 meter circumference storage ring within the original APS tunnel. APS-U’s new storage ring vacuum system is a complex assembly of over 2500 custom vacuum chambers. The vacuum pumping system is a hybrid combination of NEG-coated vacuum chambers, ion pumps, and uncoated chambers with NEG strip pumping. APS-U began operations in April 2024 and by early 2025 has successfully commissioned the vacuum system to achieve low UHV operating pressures which helped the machine reach key performance parameters and allows for reliable delivery of beam to the users with minimal downtime. The commissioning performance of the machine indicates the NEG coated chambers are performing reliably even with a relatively minimal bakeout and activation. This presentation will share results and analysis of the vacuum system commissioning and performance along with lessons learned from the installation and operations phases.

Authors

Publication Details

Journal
JACOW
Published
2026-04-02
DOI
https://doi.org/10.18429/jacow-medsi2025-thp14
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Commissioning of the APS-Upgrade storage ring vacuum system

Jason Carter
JACOW
Particle Accelerators and Free-Electron Lasers
article

Commissioning of the APS-Upgrade storage ring vacuum system

Jason Carter
article en

Abstract

The APS-Upgrade Project (APS-U) built a new electron 1100 meter circumference storage ring within the original APS tunnel. APS-U’s new storage ring vacuum system is a complex assembly of over 2500 custom vacuum chambers. The vacuum pumping system is a hybrid combination of NEG-coated vacuum chambers, ion pumps, and uncoated chambers with NEG strip pumping. APS-U began operations in April 2024 and by early 2025 has successfully commissioned the vacuum system to achieve low UHV operating pressures which helped the machine reach key performance parameters and allows for reliable delivery of beam to the users with minimal downtime. The commissioning performance of the machine indicates the NEG coated chambers are performing reliably even with a relatively minimal bakeout and activation. This presentation will share results and analysis of the vacuum system commissioning and performance along with lessons learned from the installation and operations phases.

JACOW
Affordable and clean energy
Openalex Percentile: Top 6%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.