Impact of aggregate moisture on dryer drum energy demand in asphalt mixture production: Field trial and model validation

Drying and heating of mineral aggregates is the most energy-intensive process in asphalt mixture production, with aggregate moisture as a key parameter. This study investigates the impact of aggregate moisture on dryer drum energy consumption based on field trials conducted at a batch asphalt mixing plant. Two limestone aggregate fractions, exhibiting different moisture contents, were dried and heated under controlled operating conditions and characterized by laboratory analyses. Aggregate moisture ranged from 1.46 to 9.83 m%, with the 0/2 fraction exhibiting nearly twice the moisture content of the 0/16 fraction. This observation was corroborated by laboratory tests demonstrating that particle size fractions below 2 mm disproportionately increase water absorption with decreasing particle size. The specific energy demand of drying and heating aggregates ranged from 80.07 to 139.75 kWh/t. Assuming a linear relationship between relative energy demand and aggregate moisture content, an increase of 1 m% in moisture corresponds to an additional energy demand of 6.86 kWh/t of asphalt mixture. Based on a life cycle assessment (LCA) of an asphalt concrete (AC) base layer, this increase results in a global warming potential (GWP) of 1.87 kg CO₂-eq/t asphalt mixture when using natural gas and 2.52 kg CO₂-eq/t when using heating oil. From an economic perspective, a reduction of aggregate moisture by 1 m% yields potential cost savings ranging from 0.16 to 0.58 €/t of asphalt mixture. Comparison with a commonly applied thermodynamic model yielded comparable theoretical energy demand, underscoring the necessity of accounting for casing losses in the energy balance. • Controlled plant trials quantified aggregate moisture effects on dryer drum energy demand. • An increase of 1 m% in aggregate moisture results in an additional energy demand of approximately 6.86 kWh/t asphalt mixture. • Water absorption remained nearly constant for aggregate fractions ≥ 2 mm and increased in finer fractions. • Field results agreed with a thermodynamic model, with deviations linked to casing losses.

Authors

Institutions

Publication Details

Journal
Construction and Building Materials
Published
2026-03-31
DOI
https://doi.org/10.1016/j.conbuildmat.2026.146151
Primary Topic
Asphalt Pavement Performance Evaluation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of aggregate moisture on dryer drum energy demand in asphalt mixture production: Field trial and model validation

Paul Schönauer, B. Hofko
Construction and Building Materials
Asphalt Pavement Performance Evaluation
article

Impact of aggregate moisture on dryer drum energy demand in asphalt mixture production: Field trial and model validation

Paul Schönauer, B. Hofko
article en

Abstract

Drying and heating of mineral aggregates is the most energy-intensive process in asphalt mixture production, with aggregate moisture as a key parameter. This study investigates the impact of aggregate moisture on dryer drum energy consumption based on field trials conducted at a batch asphalt mixing plant. Two limestone aggregate fractions, exhibiting different moisture contents, were dried and heated under controlled operating conditions and characterized by laboratory analyses. Aggregate moisture ranged from 1.46 to 9.83 m%, with the 0/2 fraction exhibiting nearly twice the moisture content of the 0/16 fraction. This observation was corroborated by laboratory tests demonstrating that particle size fractions below 2 mm disproportionately increase water absorption with decreasing particle size. The specific energy demand of drying and heating aggregates ranged from 80.07 to 139.75 kWh/t. Assuming a linear relationship between relative energy demand and aggregate moisture content, an increase of 1 m% in moisture corresponds to an additional energy demand of 6.86 kWh/t of asphalt mixture. Based on a life cycle assessment (LCA) of an asphalt concrete (AC) base layer, this increase results in a global warming potential (GWP) of 1.87 kg CO₂-eq/t asphalt mixture when using natural gas and 2.52 kg CO₂-eq/t when using heating oil. From an economic perspective, a reduction of aggregate moisture by 1 m% yields potential cost savings ranging from 0.16 to 0.58 €/t of asphalt mixture. Comparison with a commonly applied thermodynamic model yielded comparable theoretical energy demand, underscoring the necessity of accounting for casing losses in the energy balance. • Controlled plant trials quantified aggregate moisture effects on dryer drum energy demand. • An increase of 1 m% in aggregate moisture results in an additional energy demand of approximately 6.86 kWh/t asphalt mixture. • Water absorption remained nearly constant for aggregate fractions ≥ 2 mm and increased in finer fractions. • Field results agreed with a thermodynamic model, with deviations linked to casing losses.

Construction and Building MaterialsVol. 521
TU Wien (AT)
Responsible consumption and production
Openalex Percentile: Top 27%
Asphalt Pavement Performance Evaluation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Impact of aggregate moisture on dryer drum energy demand in asphalt mixture production: Field trial and model validation — Paul Schönauer, B. Hofko · Construction and Building Materials (2026) | TGRS Research Map | TGRS