Instability of the middle partition in deep shafts of tunnels in water-rich strata: A case study of Tianshan Shengli Tunnel No.1-1 shaft

The middle partition is crucial structure in the ventilation shaft of a transportation tunnel, and it is also a weak point in the overall stability of a deep tunnel shaft. However, there is a lack of research reports on the instability of middle partition in deep shafts in water-rich strata. Based on the No. 1-1 shaft of the Tianshan Shengli Tunnel, currently the world’s longest operational expressway tunnel. Theoretical analysis and on-site measurement methods were adopted to conduct research on the instability and failure of middle partition in shafts. The results of both methods with numerical calculations were compared. It was indicated that the main cause of the instability of the middle partition is unbalanced water level on both sides. The larger the tunnel shaft diameter, the more unfavorable the bearing stability of the middle partition. The midspan displacements and bending moments of the middle partition increase with increasing water level difference load, and the values increase with higher axial loads. Furthermore, the midspan displacements and bending moments of the middle partition decrease with the increase of section parameters and increase with the increase of tunnel shaft diameter. However, they are not significantly affected by the change of concrete strength grade and reinforcement diameter. The water level difference between the one side of the middle partition led to a three-phase trend of "rapid growth, slow growth, decline" in middle partition displacement, and they all had the characteristics of the closer to the water level. The theoretical solution is better matched with the results of on-site measurements and numerical calculations, which can reflect the instability and failure of the middle partition. On-site measurements also confirmed the cause of the instability and failure of the middle partition. The axial load threshold for instability and failure is 0.03 MPa, and the water level difference load threshold is 10 kN/m. Research results can provide a reference for the design and construction of middle partition in tunnel shaft in water-rich stratas. • The mechanism of the instability of the middle partition in shafts of within water-rich strata has been elucidated. • The middle partition instability in shafts within water-rich strata are attributed to water level differences load. • The instability loading conditions of the middle partition in shafts within water-rich strata have been investigated.

Authors

Institutions

Publication Details

Journal
Journal of Traffic and Transportation Engineering (English Edition)
Published
2026-04-01
DOI
https://doi.org/10.1016/j.jtte.2025.09.003
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Instability of the middle partition in deep shafts of tunnels in water-rich strata: A case study of Tianshan Shengli Tunnel No.1-1 shaft

Jianxun Chen, Lijun Chen, Yifan Wang, Tengfei Fang et al.
Journal of Traffic and Transportation Engineering (English Edition)
Geotechnical Engineering and Analysis
article

Instability of the middle partition in deep shafts of tunnels in water-rich strata: A case study of Tianshan Shengli Tunnel No.1-1 shaft

Jianxun Chen, Lijun Chen, Yifan Wang, Tengfei Fang, Pengyu Zhao, Pengkun Wang, Hui Chen, Guo Wu, Weiwei Liu
article en

Abstract

The middle partition is crucial structure in the ventilation shaft of a transportation tunnel, and it is also a weak point in the overall stability of a deep tunnel shaft. However, there is a lack of research reports on the instability of middle partition in deep shafts in water-rich strata. Based on the No. 1-1 shaft of the Tianshan Shengli Tunnel, currently the world’s longest operational expressway tunnel. Theoretical analysis and on-site measurement methods were adopted to conduct research on the instability and failure of middle partition in shafts. The results of both methods with numerical calculations were compared. It was indicated that the main cause of the instability of the middle partition is unbalanced water level on both sides. The larger the tunnel shaft diameter, the more unfavorable the bearing stability of the middle partition. The midspan displacements and bending moments of the middle partition increase with increasing water level difference load, and the values increase with higher axial loads. Furthermore, the midspan displacements and bending moments of the middle partition decrease with the increase of section parameters and increase with the increase of tunnel shaft diameter. However, they are not significantly affected by the change of concrete strength grade and reinforcement diameter. The water level difference between the one side of the middle partition led to a three-phase trend of "rapid growth, slow growth, decline" in middle partition displacement, and they all had the characteristics of the closer to the water level. The theoretical solution is better matched with the results of on-site measurements and numerical calculations, which can reflect the instability and failure of the middle partition. On-site measurements also confirmed the cause of the instability and failure of the middle partition. The axial load threshold for instability and failure is 0.03 MPa, and the water level difference load threshold is 10 kN/m. Research results can provide a reference for the design and construction of middle partition in tunnel shaft in water-rich stratas. • The mechanism of the instability of the middle partition in shafts of within water-rich strata has been elucidated. • The middle partition instability in shafts within water-rich strata are attributed to water level differences load. • The instability loading conditions of the middle partition in shafts within water-rich strata have been investigated.

Journal of Traffic and Transportation Engineering (English Edition)Vol. 13(2)
Chang'an University (CN)
Clean water and sanitation
Openalex Percentile: Top 35%
Geotechnical Engineering and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.