Structural linkages among lean construction barriers in Chinese EPC projects: evidence from PLS-SEM and firm-size differences

In Engineering, Procurement, and Construction (EPC) delivery, lean construction (LC) adoption often struggles because phase interdependencies, multi-tier supply chains, and shifting requirements weaken coordination and management focus. This study examines structural links among LC barrier domains in Chinese EPC projects and whether they differ by firm size. A six-domain questionnaire was adapted from prior LC barrier research and guided by the Technology–Organization–Environment framework and Contingency Theory, then refined through expert review and pilot checks. Survey data from 456 Chinese EPC stakeholders were analyzed using partial least squares structural equation modeling (PLS-SEM) to estimate structural paths among barrier dimensions, while multi-group analysis (MGA) tested firm-size differences in these paths. Results show that the institutional environment and supply chain complexity are key external pressures, and strategic leadership links them to internal organizational and technical constraints, with size-contingent effects: institutional pressures are stronger in large firms, while supply chain complexity is stronger in SMEs. The study moves beyond barrier ranking by offering a system-level structural model that clarifies barrier ordering and boundary conditions. Policymakers and clients should strengthen rule consistency and procurement governance, while contractors should tailor actions by firm size, strengthening leadership-led coordination in large firms and supply-chain integration in SMEs.

Authors

Institutions

Publication Details

Journal
Journal of Asian Architecture and Building Engineering
Published
2026-03-31
DOI
https://doi.org/10.1080/13467581.2026.2653342
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Structural linkages among lean construction barriers in Chinese EPC projects: evidence from PLS-SEM and firm-size differences

Nor Kamaliana Khamis, Dewu Zhu, Mohd Nizam Ab Rahman
Journal of Asian Architecture and Building Engineering
Construction Project Management and Performance
article

Structural linkages among lean construction barriers in Chinese EPC projects: evidence from PLS-SEM and firm-size differences

Nor Kamaliana Khamis, Dewu Zhu, Mohd Nizam Ab Rahman
article en

Abstract

In Engineering, Procurement, and Construction (EPC) delivery, lean construction (LC) adoption often struggles because phase interdependencies, multi-tier supply chains, and shifting requirements weaken coordination and management focus. This study examines structural links among LC barrier domains in Chinese EPC projects and whether they differ by firm size. A six-domain questionnaire was adapted from prior LC barrier research and guided by the Technology–Organization–Environment framework and Contingency Theory, then refined through expert review and pilot checks. Survey data from 456 Chinese EPC stakeholders were analyzed using partial least squares structural equation modeling (PLS-SEM) to estimate structural paths among barrier dimensions, while multi-group analysis (MGA) tested firm-size differences in these paths. Results show that the institutional environment and supply chain complexity are key external pressures, and strategic leadership links them to internal organizational and technical constraints, with size-contingent effects: institutional pressures are stronger in large firms, while supply chain complexity is stronger in SMEs. The study moves beyond barrier ranking by offering a system-level structural model that clarifies barrier ordering and boundary conditions. Policymakers and clients should strengthen rule consistency and procurement governance, while contractors should tailor actions by firm size, strengthening leadership-led coordination in large firms and supply-chain integration in SMEs.

Journal of Asian Architecture and Building Engineering
National University of Malaysia (MY)
Industry, innovation and infrastructure, Sustainable cities and communities
Openalex Percentile: Top 34%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Structural linkages among lean construction barriers in Chinese EPC projects: evidence from PLS-SEM and firm-size differences — Nor Kamaliana Khamis, Dewu Zhu, et al. · Journal of Asian Architecture and Building Engineering (2026) | TGRS Research Map | TGRS