A strategic roadmap for construction automation in indonesian mass housing projects

Indonesia’s national program to build three million houses annually faces a significant production capacity gap, a common challenge in developing countries. This study develops a strategic roadmap for construction automation to bridge this gap. Using a systematic methodology that integrated literature review, expert surveys (n = 50), and the Analytic Hierarchy Process (AHP) with a focus group (n = 9), this study identifies and prioritizes ten critical automation aspects. Results indicate that foundational systemic aspects: Building Standardization (priority weight = 0.2598), Management Information Systems (0.1972), and Material Supply Chain Optimization (0.1652); are significantly more critical than physical mechanization. This prioritization reveals a necessary implementation sequence: digital and process enablers must precede heavy investment in on-site automation. The study concludes by proposing a phased, dependency-aware automation roadmap, offering a validated decision-making framework for policymakers and industry stakeholders in Indonesia and similar developing economies aiming to enhance productivity through construction industrialization.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2026-04-01
DOI
https://doi.org/10.1038/s41598-026-46773-7
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A strategic roadmap for construction automation in indonesian mass housing projects

Albani Musyafa
Scientific Reports
BIM and Construction Integration
article

A strategic roadmap for construction automation in indonesian mass housing projects

Albani Musyafa
article en

Abstract

Indonesia’s national program to build three million houses annually faces a significant production capacity gap, a common challenge in developing countries. This study develops a strategic roadmap for construction automation to bridge this gap. Using a systematic methodology that integrated literature review, expert surveys (n = 50), and the Analytic Hierarchy Process (AHP) with a focus group (n = 9), this study identifies and prioritizes ten critical automation aspects. Results indicate that foundational systemic aspects: Building Standardization (priority weight = 0.2598), Management Information Systems (0.1972), and Material Supply Chain Optimization (0.1652); are significantly more critical than physical mechanization. This prioritization reveals a necessary implementation sequence: digital and process enablers must precede heavy investment in on-site automation. The study concludes by proposing a phased, dependency-aware automation roadmap, offering a validated decision-making framework for policymakers and industry stakeholders in Indonesia and similar developing economies aiming to enhance productivity through construction industrialization.

Scientific Reports
Islamic University of Indonesia (ID)
Universitas Islam Indonesia
Industry, innovation and infrastructure
Openalex Percentile: Top 7%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A strategic roadmap for construction automation in indonesian mass housing projects — Albani Musyafa · Scientific Reports (2026) | TGRS Research Map | TGRS