REALISE_Risk and Contingency Plan
The Deliverable D5.5, Risk and Contingency Plan, establishes the framework for identifying, assessing, and mitigating potential technical, administrative, and external obstacles that could affect the execution of the REALISE Project. It provides a detailed analysis of the risks identified since the project’s starting and sets the guidelines for the periodic review of the plan throughout the Project lifecycle to ensure resilience and operational continuity.
Authors
- Gianluca Sampaolo
Institutions
- University of Macerata (IT)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-03-31
- DOI
- https://doi.org/10.5281/zenodo.19360573
- Primary Topic
- Infrastructure Resilience and Vulnerability Analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00