Integration of a Natural Language Processing and Project Scheduling Tool for Contractual Delay Risk Identification in a Highway Construction Project Using LLMs

Construction contracts contain essential information regarding delay clauses. These clauses are associated with improper execution of work in accordance with contractual requirements. Contract documents require thorough review. Additionally, the limited time provided during bidding, affects manual reviews, and contractual delay terms may be overlooked and later arise during the construction stage. This research aims to develop a framework for automating identification of contractual delay terms associated with schedule delays through integration of natural language processing (NLP), project scheduling tools, and large language models (LLMs). The developed framework was applied in a case study and its applicability and functionality were evaluated. Evaluations focused on the correctness of the contractual delay terms generated by the model. The evaluation results indicate that the developed framework supports identification of contractual delay terms associated with schedule delays in the construction phase of the projects. The model performance is validated leveraging K-fold cross validation technique, evaluating training loss, training token-level accuracy, validation loss, validation token-level accuracy. It was found that the model displayed a strong performance, represented by the preceding model performance metrics with training loss and validation loss of 0.34 and 0.359, respectively and achieving training token-level accuracy and validation token-level accuracy of 92.69% and 91.87%, respectively. The framework supports a promising approach of integrating contract analysis with dynamic project schedule in a single environment and effectively enhance automation in contract analysis and identification of contractual delay risks, eventually reducing time and efforts of project stakeholders during manual contract analysis and project tracking.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2026-03-28
DOI
https://doi.org/10.1061/jladah.ladr-1500
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integration of a Natural Language Processing and Project Scheduling Tool for Contractual Delay Risk Identification in a Highway Construction Project Using LLMs

Aneetha Vilventhan, Gaureeshwar Manda
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Construction Project Management and Performance
article

Integration of a Natural Language Processing and Project Scheduling Tool for Contractual Delay Risk Identification in a Highway Construction Project Using LLMs

Aneetha Vilventhan, Gaureeshwar Manda
article en

Abstract

Construction contracts contain essential information regarding delay clauses. These clauses are associated with improper execution of work in accordance with contractual requirements. Contract documents require thorough review. Additionally, the limited time provided during bidding, affects manual reviews, and contractual delay terms may be overlooked and later arise during the construction stage. This research aims to develop a framework for automating identification of contractual delay terms associated with schedule delays through integration of natural language processing (NLP), project scheduling tools, and large language models (LLMs). The developed framework was applied in a case study and its applicability and functionality were evaluated. Evaluations focused on the correctness of the contractual delay terms generated by the model. The evaluation results indicate that the developed framework supports identification of contractual delay terms associated with schedule delays in the construction phase of the projects. The model performance is validated leveraging K-fold cross validation technique, evaluating training loss, training token-level accuracy, validation loss, validation token-level accuracy. It was found that the model displayed a strong performance, represented by the preceding model performance metrics with training loss and validation loss of 0.34 and 0.359, respectively and achieving training token-level accuracy and validation token-level accuracy of 92.69% and 91.87%, respectively. The framework supports a promising approach of integrating contract analysis with dynamic project schedule in a single environment and effectively enhance automation in contract analysis and identification of contractual delay risks, eventually reducing time and efforts of project stakeholders during manual contract analysis and project tracking.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 18(3)
National Institute of Technology Warangal (IN)
Quality Education
Openalex Percentile: Top 3%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Integration of a Natural Language Processing and Project Scheduling Tool for Contractual Delay Risk Identification in a Highway Construction Project Using LLMs — Aneetha Vilventhan, Gaureeshwar Manda · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (2026) | TGRS Research Map | TGRS