SRS180 - Addressing delays in post-operative X-rays in hip replacement surgery: a quality improvement project

Abstract Background Post-operative X-rays are essential for assessing outcomes after hip replacement surgery, but compliance with timely imaging protocols varies. This quality improvement project sought to facilitate the prompt acquisition of post-operative X-rays for trauma patients undergoing hip replacement surgery. Methods We conducted a quality improvement project using Plan-Do-Study-Act methodology over three iterative cycles between April 2024 and March 2025. Cycle 1 established baseline performance through retrospective review of 100 consecutive patients. Cycle 2 prospectively evaluated implementation of targeted interventions across all 55 eligible patients over a six-week period. Cycle 3 assessed sustainability through retrospective analysis of all 150 eligible patients without staff awareness of monitoring. Data collected included time from surgery to X-ray request, request quality, and time to X-ray acquisition. Results Baseline assessment showed 74 % of X-rays were requested on surgery day, however only 50% performed within one day post-operatively. After implementing interventions, Cycle 3 demonstrated significant improvements: 73% of requests submitted within one hour of surgery, average request time decreased from 12.3 to 5.8 h, and time from surgery to X-ray reduced from 44 to 35.6 h. The percentage of X-rays performed within one day increased from 50 to 65%. Conclusions A structured quality improvement approach successfully improved the timeliness of post-operative X-rays despite external constraints such as staffing variability and seasonal pressures. Sustainability requires robust protocols, educational tools and addressing resource limitations, particularly patient transport equipment.

Authors

Institutions

Publication Details

Journal
British journal of surgery
Published
2026-03-01
DOI
https://doi.org/10.1093/bjs/znag018.171
Primary Topic
Total Knee Arthroplasty Outcomes
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

SRS180 - Addressing delays in post-operative X-rays in hip replacement surgery: a quality improvement project

Maheswaran W Archunan, S Louette, Bochra Boumalha, Sudhruthi Paparaju et al.
British journal of surgery
Total Knee Arthroplasty Outcomes
article

SRS180 - Addressing delays in post-operative X-rays in hip replacement surgery: a quality improvement project

Maheswaran W Archunan, S Louette, Bochra Boumalha, Sudhruthi Paparaju, Edward Massa
article en

Abstract

Abstract Background Post-operative X-rays are essential for assessing outcomes after hip replacement surgery, but compliance with timely imaging protocols varies. This quality improvement project sought to facilitate the prompt acquisition of post-operative X-rays for trauma patients undergoing hip replacement surgery. Methods We conducted a quality improvement project using Plan-Do-Study-Act methodology over three iterative cycles between April 2024 and March 2025. Cycle 1 established baseline performance through retrospective review of 100 consecutive patients. Cycle 2 prospectively evaluated implementation of targeted interventions across all 55 eligible patients over a six-week period. Cycle 3 assessed sustainability through retrospective analysis of all 150 eligible patients without staff awareness of monitoring. Data collected included time from surgery to X-ray request, request quality, and time to X-ray acquisition. Results Baseline assessment showed 74 % of X-rays were requested on surgery day, however only 50% performed within one day post-operatively. After implementing interventions, Cycle 3 demonstrated significant improvements: 73% of requests submitted within one hour of surgery, average request time decreased from 12.3 to 5.8 h, and time from surgery to X-ray reduced from 44 to 35.6 h. The percentage of X-rays performed within one day increased from 50 to 65%. Conclusions A structured quality improvement approach successfully improved the timeliness of post-operative X-rays despite external constraints such as staffing variability and seasonal pressures. Sustainability requires robust protocols, educational tools and addressing resource limitations, particularly patient transport equipment.

British journal of surgeryVol. 113(Supplement_2)
Norfolk and Norwich University Hospitals NHS Foundation Trust (GB)
Openalex Percentile: Top 4%
Total Knee Arthroplasty Outcomes
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.