A Metrological Method for Characterizing Software-Induced Timing Uncertainty in a Representative PC-Based DAQ Ecosystem

• A novel SLOC method addresses a decades-old timing uncertainty problem. • The software processing period ( T loop ) is formally defined as a new measurand. • Log-Normal modeling captures the non-Gaussian long-tail behavior of T loop . • P 99 is established as the robust safety boundary for uncertainty budgets. • USB 3.2 Gen 1 fails to mitigate the software bottleneck vs. direct-bus PCI. The metrological traceability of PC-based data acquisition (DAQ) systems is fundamentally challenged by timing errors originating from the software stack in non-real-time operating systems (NRTOS). While hardware-level clock jitter is well-understood, software-induced timing uncertainty remains a critical, unaddressed component in total measurement uncertainty budgets. To resolve this, this paper establishes the software processing period ( T loop ) as a formal measurand and validates a novel, non-intrusive Software Loop Overhead Characterization (SLOC) methodology. By conducting a comprehensive experimental study across diverse hardware architectures (PCI, PXI, USB 2.0, and USB 3.2 Gen 1) and host platforms (from mobile-class to high-performance workstations), we demonstrate that T loop is the dominant source of system-level timing uncertainty. Advanced statistical modeling reveals that T loop exhibits a distinct non-Gaussian, heavy-tailed distribution, with Type A standard uncertainty ( u ( T loop ) ) ranging from 1.57 ms to 9.97 ms. Our cross-generational analysis identifies an architectural "version trap," confirming that modern high-bandwidth bus interfaces (USB 3.2 Gen 1) fail to inherently mitigate the timing bottleneck compared to legacy direct-bus architectures (PCI). Statistical significance tests (Welch’s t-test and Levene’s test) further clarify that modern software stacks primarily benefit jitter suppression rather than absolute latency reduction. Consequently, we recommend the 99th percentile ( P 99 ) as the robust boundary for GUM-compliant uncertainty budgets. This work provides a rigorous framework for transitioning from heuristic performance estimations to a data-driven, system-level metrology.

Authors

Institutions

Publication Details

Journal
Results in Engineering
Published
2026-03-01
DOI
https://doi.org/10.1016/j.rineng.2026.110263
Primary Topic
Software Reliability and Analysis Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Metrological Method for Characterizing Software-Induced Timing Uncertainty in a Representative PC-Based DAQ Ecosystem

Gan Tang
Results in Engineering
Software Reliability and Analysis Research
article

A Metrological Method for Characterizing Software-Induced Timing Uncertainty in a Representative PC-Based DAQ Ecosystem

Gan Tang
article en

Abstract

• A novel SLOC method addresses a decades-old timing uncertainty problem. • The software processing period ( T loop ) is formally defined as a new measurand. • Log-Normal modeling captures the non-Gaussian long-tail behavior of T loop . • P 99 is established as the robust safety boundary for uncertainty budgets. • USB 3.2 Gen 1 fails to mitigate the software bottleneck vs. direct-bus PCI. The metrological traceability of PC-based data acquisition (DAQ) systems is fundamentally challenged by timing errors originating from the software stack in non-real-time operating systems (NRTOS). While hardware-level clock jitter is well-understood, software-induced timing uncertainty remains a critical, unaddressed component in total measurement uncertainty budgets. To resolve this, this paper establishes the software processing period ( T loop ) as a formal measurand and validates a novel, non-intrusive Software Loop Overhead Characterization (SLOC) methodology. By conducting a comprehensive experimental study across diverse hardware architectures (PCI, PXI, USB 2.0, and USB 3.2 Gen 1) and host platforms (from mobile-class to high-performance workstations), we demonstrate that T loop is the dominant source of system-level timing uncertainty. Advanced statistical modeling reveals that T loop exhibits a distinct non-Gaussian, heavy-tailed distribution, with Type A standard uncertainty ( u ( T loop ) ) ranging from 1.57 ms to 9.97 ms. Our cross-generational analysis identifies an architectural "version trap," confirming that modern high-bandwidth bus interfaces (USB 3.2 Gen 1) fail to inherently mitigate the timing bottleneck compared to legacy direct-bus architectures (PCI). Statistical significance tests (Welch’s t-test and Levene’s test) further clarify that modern software stacks primarily benefit jitter suppression rather than absolute latency reduction. Consequently, we recommend the 99th percentile ( P 99 ) as the robust boundary for GUM-compliant uncertainty budgets. This work provides a rigorous framework for transitioning from heuristic performance estimations to a data-driven, system-level metrology.

Results in Engineering
East China Jiaotong University (CN)
Life in Land
Openalex Percentile: Top 5%
Software Reliability and Analysis Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.