A Study on Rational Pre-Tensioning Schemes for 60 m Prefabricated Railway Box Girders Considering Steel Formwork Constraints

Early-age cracking is a common issue in the prefabrication of large-scale box girders, and the application of pre-tensioning techniques to introduce pre-compressive stress is an effective measure to mitigate such cracking. To determine an optimal pre-tensioning scheme for the 60 m large-scale box girder used in the Ningbo–Xiangshan intercity railway, friction coefficient tests and field stress monitoring were conducted. A numerical model simulating the pre-tensioning process of the box girder, accounting for the constraint of the steel formwork, was developed using Abaqus 2021. Based on the validated finite element model, a parametric study was performed to investigate the effects of friction coefficient, internal formwork roof, and prestressing tendon arrangement on the pre-compressive stress. The results indicate that the bond force between cast-in-place concrete and steel formwork is approximately 2.1 times the sliding friction force. As the friction coefficient increases, the pre-compressive stress in the box girder exhibits a notable decreasing trend. For the critical midspan section S40, the inclusion of frictional effects results in a more uniform distribution of pre-compressive stress. Compared to the case without the internal formwork roof, its inclusion leads to a 9.2% to 10.4% reduction in pre-compressive stress at section S40. To mitigate prestress losses transmitted from the ends to the midspan section, it is recommended that the internal formwork be completely removed prior to prestressing tensioning. The pre-compressive stress in the box girder varies considerably with different prestressing combinations. The comparative analysis of different prestressing combinations reveals substantial variations in pre-compressive stress distribution. After evaluating multiple schemes, the optimal pre-tensioning sequence for the 60-m railway box girder is determined as follows: sequentially tensioning tendon groups F1-2, F1-4, F1-5, F1-6, and B2-3, with an anchorage stress controlled at 558 MPa. This scheme ensures that all critical sections of the box girder remain in a pre-compressive state. In particular, the pre-compressive stress at the key midspan section S40 ranges from 1.12 to 1.26 MPa, achieving the desired effect and effectively suppressing early-age cracking in the large-scale box girder concrete.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-03-26
DOI
https://doi.org/10.3390/buildings16071320
Primary Topic
Concrete Properties and Behavior
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Study on Rational Pre-Tensioning Schemes for 60 m Prefabricated Railway Box Girders Considering Steel Formwork Constraints

Zuqing Zhao, Yuliang Cai, Wei Ket Yang, Fei Wang et al.
Buildings
Concrete Properties and Behavior
article

A Study on Rational Pre-Tensioning Schemes for 60 m Prefabricated Railway Box Girders Considering Steel Formwork Constraints

Zuqing Zhao, Yuliang Cai, Wei Ket Yang, Fei Wang, Weitao Ye, Tao Zhang, Lei Wang
article en

Abstract

Early-age cracking is a common issue in the prefabrication of large-scale box girders, and the application of pre-tensioning techniques to introduce pre-compressive stress is an effective measure to mitigate such cracking. To determine an optimal pre-tensioning scheme for the 60 m large-scale box girder used in the Ningbo–Xiangshan intercity railway, friction coefficient tests and field stress monitoring were conducted. A numerical model simulating the pre-tensioning process of the box girder, accounting for the constraint of the steel formwork, was developed using Abaqus 2021. Based on the validated finite element model, a parametric study was performed to investigate the effects of friction coefficient, internal formwork roof, and prestressing tendon arrangement on the pre-compressive stress. The results indicate that the bond force between cast-in-place concrete and steel formwork is approximately 2.1 times the sliding friction force. As the friction coefficient increases, the pre-compressive stress in the box girder exhibits a notable decreasing trend. For the critical midspan section S40, the inclusion of frictional effects results in a more uniform distribution of pre-compressive stress. Compared to the case without the internal formwork roof, its inclusion leads to a 9.2% to 10.4% reduction in pre-compressive stress at section S40. To mitigate prestress losses transmitted from the ends to the midspan section, it is recommended that the internal formwork be completely removed prior to prestressing tensioning. The pre-compressive stress in the box girder varies considerably with different prestressing combinations. The comparative analysis of different prestressing combinations reveals substantial variations in pre-compressive stress distribution. After evaluating multiple schemes, the optimal pre-tensioning sequence for the 60-m railway box girder is determined as follows: sequentially tensioning tendon groups F1-2, F1-4, F1-5, F1-6, and B2-3, with an anchorage stress controlled at 558 MPa. This scheme ensures that all critical sections of the box girder remain in a pre-compressive state. In particular, the pre-compressive stress at the key midspan section S40 ranges from 1.12 to 1.26 MPa, achieving the desired effect and effectively suppressing early-age cracking in the large-scale box girder concrete.

BuildingsVol. 16(7)
University of Nottingham Ningbo China (CN), Ningbo University of Technology (CN)
Sustainable cities and communities
Openalex Percentile: Top 8%
Concrete Properties and Behavior
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.