A Post-Mortem Assessment of the Accuracy of the Percentage Cost Contingency Estimation Method

This article presents findings of a post-mortem assessment of the accuracy of the percentage method used in estimating the cost contingency. The study was based on project data obtained from an organisation in Botswana, which for confidentiality reasons, was codenamed HouseBot. The study was motivated by premise that HouseBot, pre-sells houses before construction and in this mode there is a possibility of either overpricing or underpricing the housing units due to the estimated cost contingency’s contribution to the selling price. The study used 32 housing projects completed between 2011-2018, to assess the accuracy of the percentage method based on a contingency performance index (CPI). A CPI of zero percent (0%) indicates that the estimated cost contingency (ECC) exactly predicts the approved variation amount (AVA) found in the final account. An average CPI of 3.2% obtained leading to a conclusion that the percentage method used at HouseBot lacks the required accuracy. Despite the limitation of the study using a small sample of projects, the finding points to the need for the organisation to investigate possible use of alternative estimation methods, for example, probability based methods to increase accuracy.

Authors

Institutions

Publication Details

Journal
Procedia Computer Science
Published
2026-01-01
DOI
https://doi.org/10.1016/j.procs.2026.03.137
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Post-Mortem Assessment of the Accuracy of the Percentage Cost Contingency Estimation Method

J.K Ssegawa, C Ntungamili
Procedia Computer Science
Construction Project Management and Performance
article

A Post-Mortem Assessment of the Accuracy of the Percentage Cost Contingency Estimation Method

J.K Ssegawa, C Ntungamili
article en

Abstract

This article presents findings of a post-mortem assessment of the accuracy of the percentage method used in estimating the cost contingency. The study was based on project data obtained from an organisation in Botswana, which for confidentiality reasons, was codenamed HouseBot. The study was motivated by premise that HouseBot, pre-sells houses before construction and in this mode there is a possibility of either overpricing or underpricing the housing units due to the estimated cost contingency’s contribution to the selling price. The study used 32 housing projects completed between 2011-2018, to assess the accuracy of the percentage method based on a contingency performance index (CPI). A CPI of zero percent (0%) indicates that the estimated cost contingency (ECC) exactly predicts the approved variation amount (AVA) found in the final account. An average CPI of 3.2% obtained leading to a conclusion that the percentage method used at HouseBot lacks the required accuracy. Despite the limitation of the study using a small sample of projects, the finding points to the need for the organisation to investigate possible use of alternative estimation methods, for example, probability based methods to increase accuracy.

Procedia Computer ScienceVol. 278
University of Botswana (BW)
Sustainable cities and communities
Openalex Percentile: Top 11%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Post-Mortem Assessment of the Accuracy of the Percentage Cost Contingency Estimation Method — J.K Ssegawa, C Ntungamili · Procedia Computer Science (2026) | TGRS Research Map | TGRS