SBT – Shaft excavation in erodible rock mass

During construction of the Semmering base tunnel, two shafts with a depth of approx. 250 m were excavated from the intermediate access Göstritz in lot SBT 1.1. During shaft sinking in poorly consolidated brecchiae, regressive erosion occurred along existing fractures behind the shotcrete lining, causing water and material ingress into the shaft. An extensive grouting campaign was executed, finally allowing for a significant reduction of water ingress and erosion phenomena. Subsequently, the modification of the groundwater management turned out as a key factor: The original external water collection system with ring drains outside the shotcrete lining was abandoned in favor of systematically draining the groundwater into the shaft. This modification significantly minimized new water pathways behind the shotcrete lining, thereby reducing potential erosion channels. For similar projects, it is recommended to catch groundwater in non‐erodible layers, avoid external drainage systems, grout spots with murky water ingress immediately, and minimize drilling through the lining.

Institutions

Publication Details

Journal
Geomechanics and Tunnelling
Published
2026-03-24
DOI
https://doi.org/10.1002/geot.70076
Primary Topic
Grouting, Rheology, and Soil Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

SBT – Shaft excavation in erodible rock mass

Geomechanics and Tunnelling
Grouting, Rheology, and Soil Mechanics
article

SBT – Shaft excavation in erodible rock mass

article en

Abstract

During construction of the Semmering base tunnel, two shafts with a depth of approx. 250 m were excavated from the intermediate access Göstritz in lot SBT 1.1. During shaft sinking in poorly consolidated brecchiae, regressive erosion occurred along existing fractures behind the shotcrete lining, causing water and material ingress into the shaft. An extensive grouting campaign was executed, finally allowing for a significant reduction of water ingress and erosion phenomena. Subsequently, the modification of the groundwater management turned out as a key factor: The original external water collection system with ring drains outside the shotcrete lining was abandoned in favor of systematically draining the groundwater into the shaft. This modification significantly minimized new water pathways behind the shotcrete lining, thereby reducing potential erosion channels. For similar projects, it is recommended to catch groundwater in non‐erodible layers, avoid external drainage systems, grout spots with murky water ingress immediately, and minimize drilling through the lining.

Geomechanics and Tunnelling
InfoConsult (Germany) (DE), AGO Austria (AT), IC Consulenten Ziviltechniker (Austria) (AT)
Openalex Percentile: Top 10%
Grouting, Rheology, and Soil Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.