OSeMOSYS vs MUSE Models in long-term energy planning. A case study of DRC power sector
This upload contains the OSeMOSYS and MUSE model files developed for analyzing long-term power-sector pathways in the Democratic Republic of the Congo. The models are used to explore how different planning assumptions and investor behaviors influence electrification, technology deployment, and low-carbon transition outcomes.
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-03-24
- DOI
- https://doi.org/10.5281/zenodo.19205491
- Primary Topic
- Energy and Environment Impacts
- Type
- article
- Field-Weighted Citation Impact
- 0.00