Risk-based Analysis of the Hydrological Uncertainties for Flood Management Strategies

Abstract: Designing a hydraulic structure with high capacity can impose additional costs on the project. Therefore, the importance of accurate design and proper selection of design parameters, optimal determination of flood return period and proper capacity of the flow channel are some of the topics that should been considered. Risk-based flow hydrograph estimation allows designers to take into account the uncertainties of the decision process and increase the level of reliability of hydraulic structures. In this research, hydrological uncertainties have been formulated based on probabilities to estimate the hydrograph of the dam reservoir output. To achieve this goal, time series data of maximum annual instantaneous flow for a period of 45 years were collected and analyzed. To achieve this goal, the genetic algorithm optimization method was used to calculate the best response and optimum return period. The results showed that the 40-year return period is a suitable option due to the hydrological uncertainty. Flow routing showed that the peak of the output hydrograph in the reservoir with a volume of more than 45 million cubic meters (MCM) will create a difference of about 13 m3/s.

Authors

Institutions

Publication Details

Journal
OICC Press Journals
Published
2025-09-27
DOI
https://doi.org/10.57647/jsaeb.2026.0101.03
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk-based Analysis of the Hydrological Uncertainties for Flood Management Strategies

Arda Karasakal
OICC Press Journals
Water resources management and optimization
article

Risk-based Analysis of the Hydrological Uncertainties for Flood Management Strategies

Arda Karasakal
article en

Abstract

Abstract: Designing a hydraulic structure with high capacity can impose additional costs on the project. Therefore, the importance of accurate design and proper selection of design parameters, optimal determination of flood return period and proper capacity of the flow channel are some of the topics that should been considered. Risk-based flow hydrograph estimation allows designers to take into account the uncertainties of the decision process and increase the level of reliability of hydraulic structures. In this research, hydrological uncertainties have been formulated based on probabilities to estimate the hydrograph of the dam reservoir output. To achieve this goal, time series data of maximum annual instantaneous flow for a period of 45 years were collected and analyzed. To achieve this goal, the genetic algorithm optimization method was used to calculate the best response and optimum return period. The results showed that the 40-year return period is a suitable option due to the hydrological uncertainty. Flow routing showed that the peak of the output hydrograph in the reservoir with a volume of more than 45 million cubic meters (MCM) will create a difference of about 13 m3/s.

OICC Press Journals
Ankara Yıldırım Beyazıt University (TR)
Sustainable cities and communities
Openalex Percentile: Top 28%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk-based Analysis of the Hydrological Uncertainties for Flood Management Strategies — Arda Karasakal · OICC Press Journals (2025) | TGRS Research Map | TGRS