Stochastic Techno-Economic and Environmental Optimization of Carbon Capture and Utilization (CCU) from Cement Plant for Green Brick Production

While carbon capture and utilization (CCU) technology often face economic challenges, CCU via carbon mineralization with solid waste offers a cost-effective solution. In this work, the feasibility of a proposed CCU process that utilizes captured CO2 from the accelerated weathering of limestone (AWL) process to mineralize cement kiln dust (CKD) to produce a green brick termed CKD-bicarbonate lime brick (CKD-BLB) was evaluated with techno-economic analysis (TEA). The main variable that affects the techno-economic feasibility of the proposed CCU process is the absorber size, as it dictates the amount of captured CO2 and producible CKD-BLB. This variable also indirectly impacts the environmental aspect, as different absorber sizes contribute to varying degrees of CO2 avoidable. Thus, this work conducts a multi-objective stochastic optimization to determine the optimal absorber size with consideration of profitability and CO2 avoidance. It was found that the optimal absorber size of 67.93 m3 achieved a maximum NPV of $ 3,165.38 million with a desirable CO2 avoidance of 21,337.41 $${\text{M}\text{T}}_{{\text{C}\text{O}}_{2}}$$ . Although increasing the absorber size to 93.96 m3 would increase the process’s avoidable CO2 by 2.87%, the 3.22% drop in its NPV result is a less favorable tradeoff between the two aspects. A sensitive analysis was also conducted, and the results indicate that among CKD-BLB price, electricity cost and water cost, the CKD-BLB price is the most sensitive parameter affecting the NPV of the proposed process. A ± 50% variation in CKD-BLB price leads to more than a 100% shift in NPV, while at a ± 50% variation in electricity and water costs results in less than a 30% change. Overall, the insights generated in this work enable strategic planning for decisions making.

Authors

Institutions

Publication Details

Journal
Process Integration and Optimization for Sustainability
Published
2026-03-23
DOI
https://doi.org/10.1007/s41660-026-00733-w
Primary Topic
Carbon Dioxide Capture Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Stochastic Techno-Economic and Environmental Optimization of Carbon Capture and Utilization (CCU) from Cement Plant for Green Brick Production

Bing Shen How, Lock Hei Ngu, Slyvester Yew Wang Chai
Process Integration and Optimization for Sustainability
Carbon Dioxide Capture Technologies
article

Stochastic Techno-Economic and Environmental Optimization of Carbon Capture and Utilization (CCU) from Cement Plant for Green Brick Production

Bing Shen How, Lock Hei Ngu, Slyvester Yew Wang Chai
article en

Abstract

While carbon capture and utilization (CCU) technology often face economic challenges, CCU via carbon mineralization with solid waste offers a cost-effective solution. In this work, the feasibility of a proposed CCU process that utilizes captured CO2 from the accelerated weathering of limestone (AWL) process to mineralize cement kiln dust (CKD) to produce a green brick termed CKD-bicarbonate lime brick (CKD-BLB) was evaluated with techno-economic analysis (TEA). The main variable that affects the techno-economic feasibility of the proposed CCU process is the absorber size, as it dictates the amount of captured CO2 and producible CKD-BLB. This variable also indirectly impacts the environmental aspect, as different absorber sizes contribute to varying degrees of CO2 avoidable. Thus, this work conducts a multi-objective stochastic optimization to determine the optimal absorber size with consideration of profitability and CO2 avoidance. It was found that the optimal absorber size of 67.93 m3 achieved a maximum NPV of $ 3,165.38 million with a desirable CO2 avoidance of 21,337.41 $${\text{M}\text{T}}_{{\text{C}\text{O}}_{2}}$$ . Although increasing the absorber size to 93.96 m3 would increase the process’s avoidable CO2 by 2.87%, the 3.22% drop in its NPV result is a less favorable tradeoff between the two aspects. A sensitive analysis was also conducted, and the results indicate that among CKD-BLB price, electricity cost and water cost, the CKD-BLB price is the most sensitive parameter affecting the NPV of the proposed process. A ± 50% variation in CKD-BLB price leads to more than a 100% shift in NPV, while at a ± 50% variation in electricity and water costs results in less than a 30% change. Overall, the insights generated in this work enable strategic planning for decisions making.

Process Integration and Optimization for Sustainability
Jinan University (CN), Swinburne University of Technology Sarawak Campus (MY)
Industry, innovation and infrastructure
Openalex Percentile: Top 12%
Carbon Dioxide Capture Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.