From Taxonomy to Causality: Exploring Construction Dispute Factors Using a Gaussian KGE, CN, and DEMATEL-Based Approach

Abstract Despite advances in construction project management and technology, disputes remain a persistent challenge that significantly undermines project quality, cost, and schedule performance. A major reason is that dispute causes are often multifaceted and interdependent, yet existing studies commonly focus on identifying factors. To address this gap, this study first identifies and consolidates construction dispute factors through a three-step triangulated screening process using 63 journal articles from Web of Science, ScienceDirect, and the ASCE Library and 62 dispute cases published by the Supreme People’s Court of China and Arbitration Commissions. Building on the resulting taxonomy, Gaussian knowledge graph embedding (KGE) combined with the complex network (CN) analysis is applied to quantify interfactor relations and reduce subjectivity. Finally, the Decision-Making Trial and Evaluation Laboratory (DEMATEL) method is employed to transform these quantified relations into a structured cause–effect network within the taxonomy. The results indicate that (1) 15 key dispute factors are identified; (2) these factors form a four-domain taxonomy, i.e., environment, process, contract, and behavior; and (3) the cause–effect network reveals that contract ambiguity, contract inconsistency, and contract deficiency are decisive driving causes, whereas engineering changes, work delays, cost overruns, and opportunistic behaviors are predominantly effect factors. These findings clarify the mechanism through which disputes emerge and escalate, and provide actionable guidance, like preaward contract quality checks and stronger change-management practices for dispute mitigation.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2026-08-18
DOI
https://doi.org/10.1061/jladah.ladr-1624
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

From Taxonomy to Causality: Exploring Construction Dispute Factors Using a Gaussian KGE, CN, and DEMATEL-Based Approach

Linna Geng, Sen LIN, Jian Zhang, Yuchen Jin
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Construction Project Management and Performance
article

From Taxonomy to Causality: Exploring Construction Dispute Factors Using a Gaussian KGE, CN, and DEMATEL-Based Approach

Linna Geng, Sen LIN, Jian Zhang, Yuchen Jin
article en

Abstract

Abstract Despite advances in construction project management and technology, disputes remain a persistent challenge that significantly undermines project quality, cost, and schedule performance. A major reason is that dispute causes are often multifaceted and interdependent, yet existing studies commonly focus on identifying factors. To address this gap, this study first identifies and consolidates construction dispute factors through a three-step triangulated screening process using 63 journal articles from Web of Science, ScienceDirect, and the ASCE Library and 62 dispute cases published by the Supreme People’s Court of China and Arbitration Commissions. Building on the resulting taxonomy, Gaussian knowledge graph embedding (KGE) combined with the complex network (CN) analysis is applied to quantify interfactor relations and reduce subjectivity. Finally, the Decision-Making Trial and Evaluation Laboratory (DEMATEL) method is employed to transform these quantified relations into a structured cause–effect network within the taxonomy. The results indicate that (1) 15 key dispute factors are identified; (2) these factors form a four-domain taxonomy, i.e., environment, process, contract, and behavior; and (3) the cause–effect network reveals that contract ambiguity, contract inconsistency, and contract deficiency are decisive driving causes, whereas engineering changes, work delays, cost overruns, and opportunistic behaviors are predominantly effect factors. These findings clarify the mechanism through which disputes emerge and escalate, and provide actionable guidance, like preaward contract quality checks and stronger change-management practices for dispute mitigation.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 18(4)
East China University of Science and Technology (CN), Western Sydney University (AU)
Peace, Justice and strong institutions
Openalex Percentile: Top 76%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.