Evaluation of the Production Process of the Cover Plate Components Using Time Study Technique

Time study plays a crucial role in optimizing production efficiency and resource utilization in manufacturing processes. Time study helps to counter problems that occur in the production industry such as uneven task distribution, bottlenecks, idle time, complexity, and time constraints. In this case study, Intec Precision Engineering Sdn Bhd has offered to conduct the time study for packing department that produced cover plate component in order to identify the task time, normal time and standard time. There are 12 work elements that were identified in this case study and these work elements were grouped into 5 different workstations based on cycle time. As a result, among of 12 work elements, the first 7 work elements indicates that the processes did not show any delay, where the processes can be done in range of 12% to 31% faster than the expected standard time. Meanwhile the other 5 work elements indicates a delay in task completion, which is up to 184.7 sec. In case of workstation analysis, workstation 1, 2 and 3 showcasing effective performance in terms of task completion, with 14.6% to 31.1% faster than the standard time. However, for workstation 4 and 5 were recorded a procrastinate process time about 8% and 40%, which can translated as 30.2 sec and 249.4 sec, respectively. As a conclusion, the task time, normal time, and standard time for each of the work elements are identified and proposed to the company as preliminary standard time. This is important for the company to take the work study improvement issue into consideration, where this moderate production may affected the overall production line that can cause harm to the company’s reputation, qualities and expenditures.

Authors

Publication Details

Journal
International Journal of Sustainable Construction Engineering and Technology (Universiti Tun Hussein Onn Malaysia)
Published
2024-09-09
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of the Production Process of the Cover Plate Components Using Time Study Technique

Shahrul Azmir Osman, Aida Husna Ahmad, Mohd Hazrein Jamaludin, Saliza Azlina Osman
International Journal of Sustainable Construction Engineering and Technology (Universiti Tun Hussein Onn Malaysia)
Management and Optimization Techniques
article

Evaluation of the Production Process of the Cover Plate Components Using Time Study Technique

Shahrul Azmir Osman, Aida Husna Ahmad, Mohd Hazrein Jamaludin, Saliza Azlina Osman
article en

Abstract

Time study plays a crucial role in optimizing production efficiency and resource utilization in manufacturing processes. Time study helps to counter problems that occur in the production industry such as uneven task distribution, bottlenecks, idle time, complexity, and time constraints. In this case study, Intec Precision Engineering Sdn Bhd has offered to conduct the time study for packing department that produced cover plate component in order to identify the task time, normal time and standard time. There are 12 work elements that were identified in this case study and these work elements were grouped into 5 different workstations based on cycle time. As a result, among of 12 work elements, the first 7 work elements indicates that the processes did not show any delay, where the processes can be done in range of 12% to 31% faster than the expected standard time. Meanwhile the other 5 work elements indicates a delay in task completion, which is up to 184.7 sec. In case of workstation analysis, workstation 1, 2 and 3 showcasing effective performance in terms of task completion, with 14.6% to 31.1% faster than the standard time. However, for workstation 4 and 5 were recorded a procrastinate process time about 8% and 40%, which can translated as 30.2 sec and 249.4 sec, respectively. As a conclusion, the task time, normal time, and standard time for each of the work elements are identified and proposed to the company as preliminary standard time. This is important for the company to take the work study improvement issue into consideration, where this moderate production may affected the overall production line that can cause harm to the company’s reputation, qualities and expenditures.

International Journal of Sustainable Construction Engineering and Technology (Universiti Tun Hussein Onn Malaysia)
Decent work and economic growth
Openalex Percentile: Top 28%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.