A Study on AI-Empowered Behavior Risk Identification and Early Warning in Nuclear Power Engineering Construction

Any risks arising during the construction phase of nuclear power projects become permanently embedded in the power station’s lifecycle, evolving into inherent and difficult-to-alter potential hazards. Consequently, identifying behavioral risks in this phase is critical to the successful delivery of nuclear power engineering projects. This paper proposes a behavior risk identification and early warning methodology for nuclear power construction operations based on artificial intelligence algorithms. The research employs text mining techniques to construct a risk indicator system for nuclear power construction operations; based on the You Only Look Once (YOLOv8) algorithm, it incorporates modules such as Deformable Convolutional Network (DCN), Generalized Lightweight Attention Network (GELAN), Efficient Channel Attention (ECA), and Atrous Spatial Pyramid Pooling (ASPP) to develop the DCN -GELAN-ECA- ASPP-YOLO for Nuclear Power Engineering (DGEAYoLo-NPE) model, and designs and develops a supporting behavior risk identification and early warning methodology. Results show that the precision of nuclear power construction behavioral risk detection reaches 94.3%, with a 2.2% improvement in precision. This study confirms that artificial intelligence technology can effectively enhance the behavior risk prevention and control capabilities of nuclear power construction operations.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-03-17
DOI
https://doi.org/10.3390/buildings16061178
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Study on AI-Empowered Behavior Risk Identification and Early Warning in Nuclear Power Engineering Construction

P. Liu, Chunfu Xu, Wenzhao Zhao, Ju Gao et al.
Buildings
Risk and Safety Analysis
article

A Study on AI-Empowered Behavior Risk Identification and Early Warning in Nuclear Power Engineering Construction

P. Liu, Chunfu Xu, Wenzhao Zhao, Ju Gao, Xia Li, Kai Yu, Kai Xiong
article en

Abstract

Any risks arising during the construction phase of nuclear power projects become permanently embedded in the power station’s lifecycle, evolving into inherent and difficult-to-alter potential hazards. Consequently, identifying behavioral risks in this phase is critical to the successful delivery of nuclear power engineering projects. This paper proposes a behavior risk identification and early warning methodology for nuclear power construction operations based on artificial intelligence algorithms. The research employs text mining techniques to construct a risk indicator system for nuclear power construction operations; based on the You Only Look Once (YOLOv8) algorithm, it incorporates modules such as Deformable Convolutional Network (DCN), Generalized Lightweight Attention Network (GELAN), Efficient Channel Attention (ECA), and Atrous Spatial Pyramid Pooling (ASPP) to develop the DCN -GELAN-ECA- ASPP-YOLO for Nuclear Power Engineering (DGEAYoLo-NPE) model, and designs and develops a supporting behavior risk identification and early warning methodology. Results show that the precision of nuclear power construction behavioral risk detection reaches 94.3%, with a 2.2% improvement in precision. This study confirms that artificial intelligence technology can effectively enhance the behavior risk prevention and control capabilities of nuclear power construction operations.

BuildingsVol. 16(6)
China General Nuclear Power Corporation (China) (CN), Shandong University of Science and Technology (CN)
Openalex Percentile: Top 22%
Risk and Safety Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.