Hydrogen Embrittlement Risk Analysis of Drill Pipes During Gas Kick and Throttling Circulation in Deep Well Drilling of Tarim Oilfield: A Case Study

When a H2S-containing gas kick occurs during drilling, the formation fluid containing hydrogen sulfide is mixed into the drilling fluid. Drilling fluid containing hydrogen sulfide is prone to causing hydrogen embrittlement when it comes into contact with the drill string during the upward return process. However, research on the risk and timing of hydrogen embrittlement in drill pipes remains limited. This study constructed a risk area and hydrogen embrittlement time analysis model. The risk area and time of hydrogen embrittlement in the drill pipe of the Jinyue 402 well in Tarim Oilfield were analyzed using the constructed model. The results indicate that the concentration of hydrogen sulfide in the Jinyue 402 well is in the area where the corrosion rate of steel increases rapidly, and the partial pressure of hydrogen sulfide is higher than the critical partial pressure at which corrosion cracking occurs. Taking into account the pH of the drilling fluid, fluid flow rate, hydrogen sulfide partial pressure, drill pipe tensile stress, hydrogen sulfide concentration, and gas partial pressure, the high-risk area for hydrogen sulfide corrosion damage in the Jinyue 402 well is 0–1680 m. The predicted highest risk point location and hydrogen embrittlement time are at a well length of 280 m and 21 h. Further predictions were made for the hydrogen embrittlement length and time of the Tazhong 83 and Zhonggu 503 wells in the Tarim Oilfield. The maximum prediction errors for the hydrogen embrittlement position and time of the drill pipe in the three wells were 4.8% and 5.2%, respectively. This indicates that the model can be applied to wells with different geological conditions and hydrogen sulfide concentrations.

Authors

Institutions

Publication Details

Journal
Corrosion and Materials Degradation
Published
2026-03-16
DOI
https://doi.org/10.3390/cmd7010018
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hydrogen Embrittlement Risk Analysis of Drill Pipes During Gas Kick and Throttling Circulation in Deep Well Drilling of Tarim Oilfield: A Case Study

Faling Yin, Peng Wang, Le Li, Jianwei Di et al.
Corrosion and Materials Degradation
Drilling and Well Engineering
article

Hydrogen Embrittlement Risk Analysis of Drill Pipes During Gas Kick and Throttling Circulation in Deep Well Drilling of Tarim Oilfield: A Case Study

Faling Yin, Peng Wang, Le Li, Jianwei Di, Yonghai Gao, Haiqing Guo, Yongde Zhang
article en

Abstract

When a H2S-containing gas kick occurs during drilling, the formation fluid containing hydrogen sulfide is mixed into the drilling fluid. Drilling fluid containing hydrogen sulfide is prone to causing hydrogen embrittlement when it comes into contact with the drill string during the upward return process. However, research on the risk and timing of hydrogen embrittlement in drill pipes remains limited. This study constructed a risk area and hydrogen embrittlement time analysis model. The risk area and time of hydrogen embrittlement in the drill pipe of the Jinyue 402 well in Tarim Oilfield were analyzed using the constructed model. The results indicate that the concentration of hydrogen sulfide in the Jinyue 402 well is in the area where the corrosion rate of steel increases rapidly, and the partial pressure of hydrogen sulfide is higher than the critical partial pressure at which corrosion cracking occurs. Taking into account the pH of the drilling fluid, fluid flow rate, hydrogen sulfide partial pressure, drill pipe tensile stress, hydrogen sulfide concentration, and gas partial pressure, the high-risk area for hydrogen sulfide corrosion damage in the Jinyue 402 well is 0–1680 m. The predicted highest risk point location and hydrogen embrittlement time are at a well length of 280 m and 21 h. Further predictions were made for the hydrogen embrittlement length and time of the Tazhong 83 and Zhonggu 503 wells in the Tarim Oilfield. The maximum prediction errors for the hydrogen embrittlement position and time of the drill pipe in the three wells were 4.8% and 5.2%, respectively. This indicates that the model can be applied to wells with different geological conditions and hydrogen sulfide concentrations.

Corrosion and Materials DegradationVol. 7(1)
China National Offshore Oil Corporation (China) (CN), China University of Petroleum, East China (CN), China National Petroleum Corporation (China) (CN)
Openalex Percentile: Top 20%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.