The effect of project selection strategy on irrigation-system upgrade program cost: The cost of not quantifying conservation

This study evaluates four project-selection strategies within the context of an irrigation-system upgrade conservation program. The strategies encompass a spectrum of cost-effectiveness, ranging from entirely non-quantitative approaches to Pareto-optimal methods. Program costs include expenditures for materials and labor associated with irrigation system upgrades, while program benefits are defined as reductions in edge-of-field phosphorus runoff. We investigate the sensitivity of program costs to uncertainty in landowner participation (recruitment percentage) and benefit valuations. We provide a comprehensive quantification of program costs capturing the effects of these uncertainties using a Monte Carlo sampling approach. Findings indicate that, under the most cost-effective strategy, program costs decline as participation increases. Furthermore, across all scenarios, the cost differential between less efficient strategies and the most cost-effective strategy widens with increasing participation rates. These results underscore the critical importance of employing cost-effective project-selection strategies, particularly under conditions of high participation. Additionally, we demonstrate probabilistic methods for integrating uncertainty in both recruitment percentage and project cost-effectiveness, and complement these with a non-probabilistic framework for assessing potential risks and windfalls. Collectively, these approaches advance understanding of the interactions among strategy choice, recruitment uncertainty, benefit valuation errors, and conservation program costs. Although the approach is demonstrated using an irrigation upgrade program, the underlying economic relationships among landowner participation, benefit valuation, and program cost are broadly applicable to other conservation contexts. • Greater landowner participation reduces prioritized conservation costs. • Cost is independent of landowner participation under net benefit constraints. • Under-valued benefits reduce costs but also increase risk of missing targets. • Probabilistic recruitment assumption errors propagate into cost estimates. • Non-probabilistic analysis informs risk/windfall potential.

Authors

Institutions

Publication Details

Journal
Agricultural Water Management
Published
2026-03-13
DOI
https://doi.org/10.1016/j.agwat.2026.110285
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The effect of project selection strategy on irrigation-system upgrade program cost: The cost of not quantifying conservation

Eleanor A. Bash, David Primozich, D. R. Harp, Tim Wigington et al.
Agricultural Water Management
Water resources management and optimization
article

The effect of project selection strategy on irrigation-system upgrade program cost: The cost of not quantifying conservation

Eleanor A. Bash, David Primozich, D. R. Harp, Tim Wigington, Anthony S. Orlando
article en

Abstract

This study evaluates four project-selection strategies within the context of an irrigation-system upgrade conservation program. The strategies encompass a spectrum of cost-effectiveness, ranging from entirely non-quantitative approaches to Pareto-optimal methods. Program costs include expenditures for materials and labor associated with irrigation system upgrades, while program benefits are defined as reductions in edge-of-field phosphorus runoff. We investigate the sensitivity of program costs to uncertainty in landowner participation (recruitment percentage) and benefit valuations. We provide a comprehensive quantification of program costs capturing the effects of these uncertainties using a Monte Carlo sampling approach. Findings indicate that, under the most cost-effective strategy, program costs decline as participation increases. Furthermore, across all scenarios, the cost differential between less efficient strategies and the most cost-effective strategy widens with increasing participation rates. These results underscore the critical importance of employing cost-effective project-selection strategies, particularly under conditions of high participation. Additionally, we demonstrate probabilistic methods for integrating uncertainty in both recruitment percentage and project cost-effectiveness, and complement these with a non-probabilistic framework for assessing potential risks and windfalls. Collectively, these approaches advance understanding of the interactions among strategy choice, recruitment uncertainty, benefit valuation errors, and conservation program costs. Although the approach is demonstrated using an irrigation upgrade program, the underlying economic relationships among landowner participation, benefit valuation, and program cost are broadly applicable to other conservation contexts. • Greater landowner participation reduces prioritized conservation costs. • Cost is independent of landowner participation under net benefit constraints. • Under-valued benefits reduce costs but also increase risk of missing targets. • Probabilistic recruitment assumption errors propagate into cost estimates. • Non-probabilistic analysis informs risk/windfall potential.

Agricultural Water ManagementVol. 327
Culinary Trust (US)
Life in Land
Openalex Percentile: Top 24%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.