Study on Directional Micro-Disturbance Grouting for Settlement Control of Shield Tunnel in Sand Layers Based on Numerical Simulation and In-Situ Test

Due to changes in the surrounding environment, the settlement defects of a shield metro tunnel in Wuhan have become increasingly prominent, seriously affecting its safe operation. Directional micro-disturbance grouting can effectively control the settlement of a shield tunnel. However, the grouting parameters S and H directly affect the grouting effect. This study adopts the finite difference method to analyze the influences of parameters S and H on the displacements of the shield tunnel and surrounding soil. The simulation results indicate that as S/D increases from 0.242 to 0.726, the compaction effect of the soil at the tunnel bottom gradually weakens, and the uplift displacements of both the vault and the track bed decrease accordingly, suggesting that parameter S plays a controlling role in the uplift deformation of the vault and track bed. However, as H/D increases from −0.161 to 0.323, the compaction zone of the soil at the tunnel haunch gradually shrinks, while the compaction zone at the tunnel bottom expands. At the same time, the uplift displacement of the track bed increases, and the horizontal convergence of the tunnel decreases. When parameter H varies within the range of −0.161D to 0.726D, it is observed to have a minimal impact on the uplift displacement of the tunnel vault but exerts a significant influence on both the uplift displacement of the track bed and the horizontal convergence of the tunnel. Based on the settlement control requirements for the in-situ grouting test section, the parameters S = 0.403D and H = 0.161D were selected for the in-situ grouting test. The average measured uplift displacements at the tunnel vault and track bed in the in-situ grouting test section were 14.9 mm and 9.1 mm, respectively, being only 2.6% and 4.2% lower than the numerical simulation results (15.3 mm and 9.5 mm). The strong consistency between the field-measured and simulated results validates the rationality of parameters S and H selection.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-03-13
DOI
https://doi.org/10.3390/buildings16061143
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on Directional Micro-Disturbance Grouting for Settlement Control of Shield Tunnel in Sand Layers Based on Numerical Simulation and In-Situ Test

Junjie Hu, Zhaohui Xiong, Zhaihui Ge, Jiaqi Guo et al.
Buildings
Geotechnical Engineering and Analysis
article

Study on Directional Micro-Disturbance Grouting for Settlement Control of Shield Tunnel in Sand Layers Based on Numerical Simulation and In-Situ Test

Junjie Hu, Zhaohui Xiong, Zhaihui Ge, Jiaqi Guo, Changjiang Meng, Haisu Zhao
article en

Abstract

Due to changes in the surrounding environment, the settlement defects of a shield metro tunnel in Wuhan have become increasingly prominent, seriously affecting its safe operation. Directional micro-disturbance grouting can effectively control the settlement of a shield tunnel. However, the grouting parameters S and H directly affect the grouting effect. This study adopts the finite difference method to analyze the influences of parameters S and H on the displacements of the shield tunnel and surrounding soil. The simulation results indicate that as S/D increases from 0.242 to 0.726, the compaction effect of the soil at the tunnel bottom gradually weakens, and the uplift displacements of both the vault and the track bed decrease accordingly, suggesting that parameter S plays a controlling role in the uplift deformation of the vault and track bed. However, as H/D increases from −0.161 to 0.323, the compaction zone of the soil at the tunnel haunch gradually shrinks, while the compaction zone at the tunnel bottom expands. At the same time, the uplift displacement of the track bed increases, and the horizontal convergence of the tunnel decreases. When parameter H varies within the range of −0.161D to 0.726D, it is observed to have a minimal impact on the uplift displacement of the tunnel vault but exerts a significant influence on both the uplift displacement of the track bed and the horizontal convergence of the tunnel. Based on the settlement control requirements for the in-situ grouting test section, the parameters S = 0.403D and H = 0.161D were selected for the in-situ grouting test. The average measured uplift displacements at the tunnel vault and track bed in the in-situ grouting test section were 14.9 mm and 9.1 mm, respectively, being only 2.6% and 4.2% lower than the numerical simulation results (15.3 mm and 9.5 mm). The strong consistency between the field-measured and simulated results validates the rationality of parameters S and H selection.

BuildingsVol. 16(6)
China Railway Group (China) (CN), Henan Polytechnic University (CN)
China Railway, National Key Research and Development Program of China
Sustainable cities and communities
Openalex Percentile: Top 29%
Geotechnical Engineering and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.