Evaluation and Recommendations for Rehabilitation and Modernization of a Road Tunnel in a High Mountain Area

The paper presents the evaluation and research undertaken to propose an optimal solution for the Capra–Bâlea road tunnel, within the framework of rehabilitating and modernizing the entire road section, with the objective of ensuring uninterrupted vehicular traffic during the winter season. The Capra–Bâlea road tunnel is the longest operational and under exploitation tunnel in Romania, measuring 887 m, and the highest-altitude road tunnel structure in the country, at 2042 m above sea level. It serves as a connection between the historic regions of Tara Romaneasca and Transylvania via the DN7C national road, commonly referred to as the Transfagarasan, which is among Romania’s most significant tourist routes, and contains five of the ten existing road tunnels in the country. The tunnel passes through crystalline metamorphic rocks typical of the Fagaras mountains. The construction method was typical of the 1970s, combining drill-and-blast in the central section with cut-and-cover execution at the two ends. The technical condition of the tunnel, evaluated through a detailed technical inspection, is presented, highlighting defects and proposing rehabilitation or restoration solutions. The existing cross sections are described and comparatively analyzed against the currently recommended cross-sections in accordance with present standards and gauge requirements. A three-dimensional simulation of both the current and original cross-sections was performed to investigate the behavior of this type of structure, and solutions for tunnel rehabilitation and modernization are recommended. Finally, the advantages of the proposed solution are discussed.

Authors

Institutions

Publication Details

Journal
Infrastructures
Published
2026-03-12
DOI
https://doi.org/10.3390/infrastructures11030094
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation and Recommendations for Rehabilitation and Modernization of a Road Tunnel in a High Mountain Area

Flaviu Ioan Nică, Teodor Iftimie
Infrastructures
Tunneling and Rock Mechanics
article

Evaluation and Recommendations for Rehabilitation and Modernization of a Road Tunnel in a High Mountain Area

Flaviu Ioan Nică, Teodor Iftimie
article en

Abstract

The paper presents the evaluation and research undertaken to propose an optimal solution for the Capra–Bâlea road tunnel, within the framework of rehabilitating and modernizing the entire road section, with the objective of ensuring uninterrupted vehicular traffic during the winter season. The Capra–Bâlea road tunnel is the longest operational and under exploitation tunnel in Romania, measuring 887 m, and the highest-altitude road tunnel structure in the country, at 2042 m above sea level. It serves as a connection between the historic regions of Tara Romaneasca and Transylvania via the DN7C national road, commonly referred to as the Transfagarasan, which is among Romania’s most significant tourist routes, and contains five of the ten existing road tunnels in the country. The tunnel passes through crystalline metamorphic rocks typical of the Fagaras mountains. The construction method was typical of the 1970s, combining drill-and-blast in the central section with cut-and-cover execution at the two ends. The technical condition of the tunnel, evaluated through a detailed technical inspection, is presented, highlighting defects and proposing rehabilitation or restoration solutions. The existing cross sections are described and comparatively analyzed against the currently recommended cross-sections in accordance with present standards and gauge requirements. A three-dimensional simulation of both the current and original cross-sections was performed to investigate the behavior of this type of structure, and solutions for tunnel rehabilitation and modernization are recommended. Finally, the advantages of the proposed solution are discussed.

InfrastructuresVol. 11(3)
Technical University of Civil Engineering of Bucharest (RO)
Life below water, Sustainable cities and communities
Openalex Percentile: Top 25%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.