Modeling and performance evaluation of hybrid SLB-PV systems for sustainable telecom tower power supply in Bangladesh

Telecom towers in Bangladesh face persistent power reliability challenges due to frequent grid outages and heavy dependence on diesel generators, resulting in high operating costs and carbon emissions. This study presents the modeling and performance evaluation of a hybrid photovoltaic–second-life battery energy storage system (SLB–PV) for sustainable base transceiver station (BTS) power supply. Repurposed Nissan Leaf ZE0 battery modules were experimentally characterized using an Arbin Battery Tester to determine capacity, state-of-health (SoH), and degradation behavior, and subsequently integrated into system modeling. A representative rural BTS site in Rangpur, Bangladesh, with a daily load of approximately 40 kWh, was analyzed using a multi-tool framework combining HOMER Pro, MATLAB Simulink, and PVsyst. Results show that a 10 kWp PV array coupled with 238 SLB modules (7S×34 P) can achieve telecom-grade reliability with system availability exceeding 99.9% while eliminating routine diesel generator operation. PV supplies approximately 48–52% of annual energy demand, and the SLBESS operates at an average of 1.4 equivalent cycles per day within a controlled 20–80% state-of-charge window, yielding a projected battery lifetime of 5–7 years. The hybrid system reduces diesel consumption by approximately 85% and lowers lifecycle CO₂ emissions by 55–65% compared to conventional diesel-only configurations. These findings confirm that hybrid SLB–PV systems provide a cost-effective, reliable, and environmentally sustainable alternative for telecom tower power supply in Bangladesh, while supporting circular economy objectives through extended battery reuse. • Hybrid PV–second-life EV battery system proposed for telecom towers in Bangladesh. • Experimentally characterized Nissan Leaf second-life batteries integrated into system design. • Hybrid system achieves > 99.9% BTS availability with minimal diesel generator operation. • PV supplies nearly half of annual energy demand, extending battery lifetime to 5–7 years. • System reduces diesel use by 85% and lifecycle CO₂ emissions by 55–65%.

Authors

Institutions

Publication Details

Journal
Energy Reports
Published
2026-03-11
DOI
https://doi.org/10.1016/j.egyr.2026.109182
Primary Topic
Hybrid Renewable Energy Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modeling and performance evaluation of hybrid SLB-PV systems for sustainable telecom tower power supply in Bangladesh

Kazy Noor e Alam Siddiquee, Md Tanjil Sarker, Md. Golam Sadeque, Marran Al Qwaid et al.
Energy Reports
Hybrid Renewable Energy Systems
article

Modeling and performance evaluation of hybrid SLB-PV systems for sustainable telecom tower power supply in Bangladesh

Kazy Noor e Alam Siddiquee, Md Tanjil Sarker, Md. Golam Sadeque, Marran Al Qwaid, Hezerul Abdul Karim
article en

Abstract

Telecom towers in Bangladesh face persistent power reliability challenges due to frequent grid outages and heavy dependence on diesel generators, resulting in high operating costs and carbon emissions. This study presents the modeling and performance evaluation of a hybrid photovoltaic–second-life battery energy storage system (SLB–PV) for sustainable base transceiver station (BTS) power supply. Repurposed Nissan Leaf ZE0 battery modules were experimentally characterized using an Arbin Battery Tester to determine capacity, state-of-health (SoH), and degradation behavior, and subsequently integrated into system modeling. A representative rural BTS site in Rangpur, Bangladesh, with a daily load of approximately 40 kWh, was analyzed using a multi-tool framework combining HOMER Pro, MATLAB Simulink, and PVsyst. Results show that a 10 kWp PV array coupled with 238 SLB modules (7S×34 P) can achieve telecom-grade reliability with system availability exceeding 99.9% while eliminating routine diesel generator operation. PV supplies approximately 48–52% of annual energy demand, and the SLBESS operates at an average of 1.4 equivalent cycles per day within a controlled 20–80% state-of-charge window, yielding a projected battery lifetime of 5–7 years. The hybrid system reduces diesel consumption by approximately 85% and lowers lifecycle CO₂ emissions by 55–65% compared to conventional diesel-only configurations. These findings confirm that hybrid SLB–PV systems provide a cost-effective, reliable, and environmentally sustainable alternative for telecom tower power supply in Bangladesh, while supporting circular economy objectives through extended battery reuse. • Hybrid PV–second-life EV battery system proposed for telecom towers in Bangladesh. • Experimentally characterized Nissan Leaf second-life batteries integrated into system design. • Hybrid system achieves > 99.9% BTS availability with minimal diesel generator operation. • PV supplies nearly half of annual energy demand, extending battery lifetime to 5–7 years. • System reduces diesel use by 85% and lifecycle CO₂ emissions by 55–65%.

Energy ReportsVol. 15
Multimedia University (MY), Shaqra University (SA), Pabna University of Science and Technology (BD), Artificial Intelligence in Medicine (Canada) (CA)
Responsible consumption and production
Openalex Percentile: Top 28%
Hybrid Renewable Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.