A DSM-Based Analysis and Improvement of Structural Complexity in Off Site Construction Factory Workflows - Focused on a Large-Scale OSC Project Case

This study applies Design Structure Matrix (DSM) methodology to diagnose and improve structural complexity in Off-Site Construction (OSC) factory processes, using a large-scale Korean project comprising 575 modular units. Field observations and BIM-based modeling identified 62 manufacturing activities. DSM partitioning analysis revealed critical structural issues: 11 feedback loops, four interdependent activity clusters, and physical workflow discontinuities. A TO-BE model was developed by integrating fragmented processes and decomposing complex clusters into sequential workflows. DSM validation confirmed the complete elimination of all feed-back links and clusters, achieving a fully sequential structure that supports the transition from batch production to continuous-flow OSC manufacturing.

Authors

Publication Details

Journal
Korean Journal of Computational Design and Engineering
Published
2026-03-11
DOI
https://doi.org/10.7315/cde.2026.001
Primary Topic
Product Development and Customization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A DSM-Based Analysis and Improvement of Structural Complexity in Off Site Construction Factory Workflows - Focused on a Large-Scale OSC Project Case

Chanwoo Jung, Yonghan Ahn, Seokhyeon Moon, JooSung Lee
Korean Journal of Computational Design and Engineering
Product Development and Customization
article

A DSM-Based Analysis and Improvement of Structural Complexity in Off Site Construction Factory Workflows - Focused on a Large-Scale OSC Project Case

Chanwoo Jung, Yonghan Ahn, Seokhyeon Moon, JooSung Lee
article en

Abstract

This study applies Design Structure Matrix (DSM) methodology to diagnose and improve structural complexity in Off-Site Construction (OSC) factory processes, using a large-scale Korean project comprising 575 modular units. Field observations and BIM-based modeling identified 62 manufacturing activities. DSM partitioning analysis revealed critical structural issues: 11 feedback loops, four interdependent activity clusters, and physical workflow discontinuities. A TO-BE model was developed by integrating fragmented processes and decomposing complex clusters into sequential workflows. DSM validation confirmed the complete elimination of all feed-back links and clusters, achieving a fully sequential structure that supports the transition from batch production to continuous-flow OSC manufacturing.

Korean Journal of Computational Design and EngineeringVol. 31(1)
Industry, innovation and infrastructure
Openalex Percentile: Top 30%
Product Development and Customization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.