Application research on high speed railway roadbed deformation monitoring based on EM processing
By establishing a mathematical model based measured data, it is possible to predict the post-construction settlement data of the high-speed railway subgrade accurately, which can provide an effective reference for the timing of laying. The EM processing is used to establish a mathematical model for the measured settlement data, and the appropriate initial parameters are selected to predict the post-construction settlement data. The modeling results show that the EM processing has good accuracy and reliability in predicting the post-construction settlement of the high-speed railway subgrade.
Authors
- Qingjuan Sun
- Dachuan Tian
- Haitao Ma
Institutions
- Kaifeng University (CN)
- Yellow River Conservancy Technical Institute (CN)
- China Railway Construction Machinery Research & Design Institute (CN)
Publication Details
- Journal
- Discover Applied Sciences
- Published
- 2026-03-09
- DOI
- https://doi.org/10.1007/s42452-026-08286-w
- Primary Topic
- Railway Engineering and Dynamics
- Type
- article
- Field-Weighted Citation Impact
- 0.00