Automatic Transport System for Replacing Disc Cutters in Tunnel Boring Machine

ABSTRACT This paper presents a novel multilayer cutter transport system for automated disc cutter replacement in slurry‐shield tunnel boring machines (TBMs) under hyperbaric conditions. The system addresses the critical challenge of transporting heavy () cutters through confined chambers and introduces three key innovations, a problem previously unsolved in robotic TBM maintenance. Our contributions include: (1) a compact two‐layer conveyor‐lifter mechanism optimized for narrow‐space operation, (2) a breadth‐first search‐based topology optimization framework that maximizes storage capacity while minimizing transition steps, and (3) a comprehensive workflow analysis enabling fully automated cutter exchange. Experimental validations demonstrate reliable transport of three cutters per cycle with 2.4× efficiency improvement over manual methods, representing a significant advancement in TBM automation and worker safety.

Authors

Institutions

Publication Details

Journal
Journal of Field Robotics
Published
2026-02-25
DOI
https://doi.org/10.1002/rob.70187
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Automatic Transport System for Replacing Disc Cutters in Tunnel Boring Machine

Zhengtao Hu, Liang Du, Sheng Bao, Jianjun Yuan
Journal of Field Robotics
Tunneling and Rock Mechanics
article

Automatic Transport System for Replacing Disc Cutters in Tunnel Boring Machine

Zhengtao Hu, Liang Du, Sheng Bao, Jianjun Yuan
article en

Abstract

ABSTRACT This paper presents a novel multilayer cutter transport system for automated disc cutter replacement in slurry‐shield tunnel boring machines (TBMs) under hyperbaric conditions. The system addresses the critical challenge of transporting heavy () cutters through confined chambers and introduces three key innovations, a problem previously unsolved in robotic TBM maintenance. Our contributions include: (1) a compact two‐layer conveyor‐lifter mechanism optimized for narrow‐space operation, (2) a breadth‐first search‐based topology optimization framework that maximizes storage capacity while minimizing transition steps, and (3) a comprehensive workflow analysis enabling fully automated cutter exchange. Experimental validations demonstrate reliable transport of three cutters per cycle with 2.4× efficiency improvement over manual methods, representing a significant advancement in TBM automation and worker safety.

Journal of Field Robotics
Shanghai University (CN)
Decent work and economic growth
Openalex Percentile: Top 30%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.