Creating a holistic understanding of design and on-site construction labour productivity drivers: identifying phase universal and phase-specific drivers

Labour productivity in construction is typically examined separately within the design- and construction-phases, resulting in a fragmented understanding of productivity drivers. This study provides an integrated cross-phase analysis by identifying factors relevant to both phases and comparing their importance. With outset in design and on-site productivity studies, 22 cross-phase factors were identified. Using quota sampling, survey data were collected from 156 professionals, 80 design-focused and 76 on-site-focused. A Spearman correlation showed strong agreement on the relative ranking of factors ((Formula presented.) = 0.826), while Multiple-Correspondence-Analysis demonstrated extensive clustering across groups. A Mann–Whitney test did after Holm’s correction identified three significant differences: ‘Weather’ and ‘Supervision’ were more influential on-site, while ‘Labour fatigue’ was more important in design. The Friedman ranking identified five top universal drivers: ‘Coordination and collaboration’, ‘Planning and sequencing’, ‘Availability and quality of information’, ‘Competency of the project manager’, and ‘Incomplete or unclear specifications’. The findings demonstrate that productivity across phases is shaped by a shared core of primarily management-related drivers, supplemented by phase specific influences. These insights highlight the need for integrated management practices that strengthen coordination and information quality across phases, while tailoring supervisory and workload strategies to the specific phase.

Authors

Institutions

Publication Details

Journal
International Journal of Construction Management
Published
2026-03-03
DOI
https://doi.org/10.1080/15623599.2026.2636015
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Creating a holistic understanding of design and on-site construction labour productivity drivers: identifying phase universal and phase-specific drivers

Søren Munch Lindhard
International Journal of Construction Management
Construction Project Management and Performance
article

Creating a holistic understanding of design and on-site construction labour productivity drivers: identifying phase universal and phase-specific drivers

Søren Munch Lindhard
article en

Abstract

Labour productivity in construction is typically examined separately within the design- and construction-phases, resulting in a fragmented understanding of productivity drivers. This study provides an integrated cross-phase analysis by identifying factors relevant to both phases and comparing their importance. With outset in design and on-site productivity studies, 22 cross-phase factors were identified. Using quota sampling, survey data were collected from 156 professionals, 80 design-focused and 76 on-site-focused. A Spearman correlation showed strong agreement on the relative ranking of factors ((Formula presented.) = 0.826), while Multiple-Correspondence-Analysis demonstrated extensive clustering across groups. A Mann–Whitney test did after Holm’s correction identified three significant differences: ‘Weather’ and ‘Supervision’ were more influential on-site, while ‘Labour fatigue’ was more important in design. The Friedman ranking identified five top universal drivers: ‘Coordination and collaboration’, ‘Planning and sequencing’, ‘Availability and quality of information’, ‘Competency of the project manager’, and ‘Incomplete or unclear specifications’. The findings demonstrate that productivity across phases is shaped by a shared core of primarily management-related drivers, supplemented by phase specific influences. These insights highlight the need for integrated management practices that strengthen coordination and information quality across phases, while tailoring supervisory and workload strategies to the specific phase.

International Journal of Construction Management
Aalborg University (DK)
Decent work and economic growth
Openalex Percentile: Top 38%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Creating a holistic understanding of design and on-site construction labour productivity drivers: identifying phase universal and phase-specific drivers — Søren Munch Lindhard · International Journal of Construction Management (2026) | TGRS Research Map | TGRS