The study examined the factors influencing the high cost of building materials for public housing projects in Anambra State, Nigeria, using a survey research design. The target population comprised 470 construction professionals, including architects, builders, quantity surveyors, and structural engineers, with 425 completed and valid questionnaires returned, representing a response rate of 90.4%. Data were analyzed using SPSS version 26, employing descriptive statistics to summarize demographic and perception data, and inferential statistics, including one-sample t-tests, to assess the significance of identified factors. Findings revealed that economic-related factors were the most influential determinants of building material costs, with a group mean of 0.82, where inflation and fluctuations in material prices were the most critical (RII = 0.84), followed by exchange rate volatility (RII = 0.83). Stakeholder-related factors, including improper planning (RII = 0.83) and delays in supply (RII = 0.81), ranked second (G.mean = 0.80), while building production-related factors such as labor efficiency and site conditions contributed moderately (G.mean = 0.79). External factors, including government policies and weather conditions, were ranked fourth (G.mean = 0.77). The overall one-sample t-test indicated a statistically significant effect of these factors on material costs (t = 48.401, df = 424, p < 0.001), with a mean score of 4.11, significantly above the neutral benchmark. The study concluded that the high cost of building materials in Anambra State is driven by a combination of macroeconomic, stakeholder, production-related, and external determinants. Effective mitigation requires coordinated policy measures, improved project planning, enhanced stakeholder management, and investment in local material production. These interventions are critical for reducing construction costs, improving efficiency in public housing delivery, and enhancing affordability and sustainability in the state’s housing sector.

Authors

Publication Details

Journal
Iconic Research and Engineering Journals
Published
2026-03-05
DOI
https://doi.org/10.64388/irev9i8-1714738
Primary Topic
Construction Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Examination of Factors Influencing Cost of Building Materials in Anambra State.

Chukwuma C., Iheama N. B., Obiora C. O.
Iconic Research and Engineering Journals
Construction Engineering and Safety
article

Examination of Factors Influencing Cost of Building Materials in Anambra State.

Chukwuma C., Iheama N. B., Obiora C. O.
article en

Abstract

The study examined the factors influencing the high cost of building materials for public housing projects in Anambra State, Nigeria, using a survey research design. The target population comprised 470 construction professionals, including architects, builders, quantity surveyors, and structural engineers, with 425 completed and valid questionnaires returned, representing a response rate of 90.4%. Data were analyzed using SPSS version 26, employing descriptive statistics to summarize demographic and perception data, and inferential statistics, including one-sample t-tests, to assess the significance of identified factors. Findings revealed that economic-related factors were the most influential determinants of building material costs, with a group mean of 0.82, where inflation and fluctuations in material prices were the most critical (RII = 0.84), followed by exchange rate volatility (RII = 0.83). Stakeholder-related factors, including improper planning (RII = 0.83) and delays in supply (RII = 0.81), ranked second (G.mean = 0.80), while building production-related factors such as labor efficiency and site conditions contributed moderately (G.mean = 0.79). External factors, including government policies and weather conditions, were ranked fourth (G.mean = 0.77). The overall one-sample t-test indicated a statistically significant effect of these factors on material costs (t = 48.401, df = 424, p < 0.001), with a mean score of 4.11, significantly above the neutral benchmark. The study concluded that the high cost of building materials in Anambra State is driven by a combination of macroeconomic, stakeholder, production-related, and external determinants. Effective mitigation requires coordinated policy measures, improved project planning, enhanced stakeholder management, and investment in local material production. These interventions are critical for reducing construction costs, improving efficiency in public housing delivery, and enhancing affordability and sustainability in the state’s housing sector.

Iconic Research and Engineering JournalsVol. 9(8)
Openalex Percentile: Top 34%
Construction Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.