R&D Cost Sharing of Intelligent Upgrading of Photovoltaic Power Stations

The intelligent upgrading of photovoltaic (PV) power stations can improve their power-generating capacity, reduce operation and maintenance (O&M) costs, and effectively conserve energy and reduce emissions. However, the pressure of research and development (R&D) investment, as well as market demand uncertainty faced by PV technical suppliers, has become an obstacle to intelligent upgrading. From the perspective of R&D cost sharing between PV project operators and technical equipment suppliers in the PV supply chain, this study presents game models for suppliers and operators under the modes of R&D cost sharing and non-sharing, and compares the benefits to both parties under the cost-sharing contract. The results show that under the cost-sharing mode, the operators share a certain proportion of R&D costs with the suppliers, which can improve the effort level of R&D. The greater the impact of the power generation increased by intelligent products on market demand, the better the operator’s maintenance efforts, and the more motivated the operator is to choose the cost-sharing strategy. By setting a reasonable wholesale price for products, both parties can balance their profits.

Authors

Institutions

Publication Details

Journal
Systems
Published
2026-03-04
DOI
https://doi.org/10.3390/systems14030277
Primary Topic
Photovoltaic Systems and Sustainability
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

R&D Cost Sharing of Intelligent Upgrading of Photovoltaic Power Stations

Yuhan Chen, Yibo Hu, Li Hou
Systems
Photovoltaic Systems and Sustainability
article

R&D Cost Sharing of Intelligent Upgrading of Photovoltaic Power Stations

Yuhan Chen, Yibo Hu, Li Hou
article en

Abstract

The intelligent upgrading of photovoltaic (PV) power stations can improve their power-generating capacity, reduce operation and maintenance (O&M) costs, and effectively conserve energy and reduce emissions. However, the pressure of research and development (R&D) investment, as well as market demand uncertainty faced by PV technical suppliers, has become an obstacle to intelligent upgrading. From the perspective of R&D cost sharing between PV project operators and technical equipment suppliers in the PV supply chain, this study presents game models for suppliers and operators under the modes of R&D cost sharing and non-sharing, and compares the benefits to both parties under the cost-sharing contract. The results show that under the cost-sharing mode, the operators share a certain proportion of R&D costs with the suppliers, which can improve the effort level of R&D. The greater the impact of the power generation increased by intelligent products on market demand, the better the operator’s maintenance efforts, and the more motivated the operator is to choose the cost-sharing strategy. By setting a reasonable wholesale price for products, both parties can balance their profits.

SystemsVol. 14(3)
Ningbo University of Technology (CN), Dalian University of Technology (CN)
Ningbo University, Ningbo University of Technology, Fundamental Research Funds for the Central Universities, National Social Science Fund of China
Affordable and clean energy
Openalex Percentile: Top 44%
Photovoltaic Systems and Sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

R&D Cost Sharing of Intelligent Upgrading of Photovoltaic Power Stations — Yuhan Chen, Yibo Hu, et al. · Systems (2026) | TGRS Research Map | TGRS