Evaluating Strategic Workforce Decisions in Aggregate Production Planning under Demand Uncertainty: A Two-Stage Stochastic MILP with Out-of-Sample Assessment

Aggregate production planning (APP) requires balancing workforce and operational decisions over a medium-term horizon. This study formulates and applies a two-stage stochastic mixed integer linear program (MILP) for APP with the primary objective of evaluating strategic workforce planning decisions under demand uncertainty. Workforce decisions are modeled as here-and-now commitments, while operational decisions are optimized as recourse actions in response to realized demand. The framework is demonstrated in an illustrative furniture manufacturing setting over a 12-month horizon with seasonally varying cost parameters. Demand scenarios are generated by combining Holt–Winters point forecasts with forecast-error scenarios obtained through a rolling-origin procedure and a moment-matching approach, yielding demand trajectories that reflect the statistical properties and temporal dependence of forecast uncertainty. Using these scenarios, the model quantifies cost–service trade-offs under alternative backorder penalty severities. To assess the robustness of the resulting workforce plans, this study conducts an out-of-sample evaluation based on observed demand from a holdout year and a wait-and-see benchmark, a validation perspective that has received limited attention in the APP literature. The out-of-sample results indicate that the stochastic model produces feasible and cost-effective workforce decisions that remain near-optimal under observed demand. Overall, the proposed framework serves as an effective decision-support tool for APP under demand uncertainty, supporting the evaluation of workforce and operational decisions within a unified stochastic framework.

Authors

Institutions

Publication Details

Journal
International Journal of Engineering Technologies IJET
Published
2026-03-03
DOI
https://doi.org/10.19072/ijet.1879062
Primary Topic
Scheduling and Timetabling Solutions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluating Strategic Workforce Decisions in Aggregate Production Planning under Demand Uncertainty: A Two-Stage Stochastic MILP with Out-of-Sample Assessment

Didem Sari
International Journal of Engineering Technologies IJET
Scheduling and Timetabling Solutions
article

Evaluating Strategic Workforce Decisions in Aggregate Production Planning under Demand Uncertainty: A Two-Stage Stochastic MILP with Out-of-Sample Assessment

Didem Sari
article en

Abstract

Aggregate production planning (APP) requires balancing workforce and operational decisions over a medium-term horizon. This study formulates and applies a two-stage stochastic mixed integer linear program (MILP) for APP with the primary objective of evaluating strategic workforce planning decisions under demand uncertainty. Workforce decisions are modeled as here-and-now commitments, while operational decisions are optimized as recourse actions in response to realized demand. The framework is demonstrated in an illustrative furniture manufacturing setting over a 12-month horizon with seasonally varying cost parameters. Demand scenarios are generated by combining Holt–Winters point forecasts with forecast-error scenarios obtained through a rolling-origin procedure and a moment-matching approach, yielding demand trajectories that reflect the statistical properties and temporal dependence of forecast uncertainty. Using these scenarios, the model quantifies cost–service trade-offs under alternative backorder penalty severities. To assess the robustness of the resulting workforce plans, this study conducts an out-of-sample evaluation based on observed demand from a holdout year and a wait-and-see benchmark, a validation perspective that has received limited attention in the APP literature. The out-of-sample results indicate that the stochastic model produces feasible and cost-effective workforce decisions that remain near-optimal under observed demand. Overall, the proposed framework serves as an effective decision-support tool for APP under demand uncertainty, supporting the evaluation of workforce and operational decisions within a unified stochastic framework.

International Journal of Engineering Technologies IJETVol. 10(4)
Alanya Alaaddin Keykubat Üniversitesi (TR)
Openalex Percentile: Top 42%
Scheduling and Timetabling Solutions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluating Strategic Workforce Decisions in Aggregate Production Planning under Demand Uncertainty: A Two-Stage Stochastic MILP with Out-of-Sample Assessment — Didem Sari · International Journal of Engineering Technologies IJET (2026) | TGRS Research Map | TGRS