Cost Management of Innovative Projects Based on a Cascade Approach in the Corporate Finance System

The article focuses on developing a cost management model for innovation projects based on a modified cascade approach. The research is relevant due to the need to resolve the contradiction between the requirement for financial discipline and the flexibility needed for management under high uncertainty. The proposed model integrates the Earned Value Management (EVM) methodology for operational control and a system of Key Performance Indicators (KPI) for the final assessment at each stage of the project life cycle. The model involves phased funding and control through a stage-gate system, enabling informed decisions on project continuation, adjustment, or termination. The practical significance of the work lies in providing tools to improve the predictability of financial results and minimize the risks of budget overruns in a corporate environment, ensuring the strategic alignment of innovation initiatives with the company's value creation goals.

Authors

Institutions

Publication Details

Journal
Scientific Research and Development Economics of the Firm
Published
2026-03-02
DOI
https://doi.org/10.12737/2306-627x-2026-15-1-74-81
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost Management of Innovative Projects Based on a Cascade Approach in the Corporate Finance System

S B Baurina, I. A. Gamarnik
Scientific Research and Development Economics of the Firm
Value Engineering and Management
article

Cost Management of Innovative Projects Based on a Cascade Approach in the Corporate Finance System

S B Baurina, I. A. Gamarnik
article en

Abstract

The article focuses on developing a cost management model for innovation projects based on a modified cascade approach. The research is relevant due to the need to resolve the contradiction between the requirement for financial discipline and the flexibility needed for management under high uncertainty. The proposed model integrates the Earned Value Management (EVM) methodology for operational control and a system of Key Performance Indicators (KPI) for the final assessment at each stage of the project life cycle. The model involves phased funding and control through a stage-gate system, enabling informed decisions on project continuation, adjustment, or termination. The practical significance of the work lies in providing tools to improve the predictability of financial results and minimize the risks of budget overruns in a corporate environment, ensuring the strategic alignment of innovation initiatives with the company's value creation goals.

Scientific Research and Development Economics of the FirmVol. 15(1)
Plekhanov Russian University of Economics (RU)
Openalex Percentile: Top 41%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Cost Management of Innovative Projects Based on a Cascade Approach in the Corporate Finance System — S B Baurina, I. A. Gamarnik · Scientific Research and Development Economics of the Firm (2026) | TGRS Research Map | TGRS