Critical Success Factors for IPD Implementation in Public Building Projects in Anambra State, Nigeria

Over the years, construction projects in Nigeria have been delivered using conventional methods. These methods have long been challenged by cost overruns, delays, poor project outcomes, and stakeholder conflict, particularly in public building projects. Integrated Project Delivery (IPD) has emerged globally as an innovative delivery approach to improve current methods and increase project performance by integrating collaboration, shared risk and reward, and the people, systems, and practices throughout the project lifecycle. This study aims to assess the key critical success factors for implementing IPD in public building projects in Anambra State, Nigeria. To achieve this, the hypothesis was formulated that no significant correlation exists between stakeholder collaboration and the success of IPD implementation in public building projects. The study adopted a descriptive research design. Ninety-two (92) copies of the questionnaire were administered to professionals in the Ministry of Housing in Anambra State. From the analysed data, the key critical success factors for IPD implementation were early stakeholder involvement (4.75), collaboration mindset (4.66), sharing risk and reward (4.59), mutual respect and trust (4.56), and multi-party contract (4.41). The study recommended that the government should strengthen its procurement policy to allow the implementation of collaborative delivery approaches such as IPD. Regular workshops, seminars, and training programmes on BIM, Lean practices, and IPD should be provided for public building construction stakeholders. Finally, the study contributed to the knowledge on IPD by highlighting the importance of stakeholder collaboration and other key success factors in the successful implementation of Integrated Project Delivery in public building projects in Anambra State.

Authors

Publication Details

Journal
Iconic Research and Engineering Journals
Published
2026-02-26
DOI
https://doi.org/10.64388/irev9i8-1714469
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Critical Success Factors for IPD Implementation in Public Building Projects in Anambra State, Nigeria

Christian Obinna Mgbeahuru, Kevin Chuks Okolie, Godwin obumneme Okoli, Prof. Chukwunwike Charles Egolum et al.
Iconic Research and Engineering Journals
Construction Project Management and Performance
article

Critical Success Factors for IPD Implementation in Public Building Projects in Anambra State, Nigeria

Christian Obinna Mgbeahuru, Kevin Chuks Okolie, Godwin obumneme Okoli, Prof. Chukwunwike Charles Egolum, Arinze Uchenna Okeke
article en

Abstract

Over the years, construction projects in Nigeria have been delivered using conventional methods. These methods have long been challenged by cost overruns, delays, poor project outcomes, and stakeholder conflict, particularly in public building projects. Integrated Project Delivery (IPD) has emerged globally as an innovative delivery approach to improve current methods and increase project performance by integrating collaboration, shared risk and reward, and the people, systems, and practices throughout the project lifecycle. This study aims to assess the key critical success factors for implementing IPD in public building projects in Anambra State, Nigeria. To achieve this, the hypothesis was formulated that no significant correlation exists between stakeholder collaboration and the success of IPD implementation in public building projects. The study adopted a descriptive research design. Ninety-two (92) copies of the questionnaire were administered to professionals in the Ministry of Housing in Anambra State. From the analysed data, the key critical success factors for IPD implementation were early stakeholder involvement (4.75), collaboration mindset (4.66), sharing risk and reward (4.59), mutual respect and trust (4.56), and multi-party contract (4.41). The study recommended that the government should strengthen its procurement policy to allow the implementation of collaborative delivery approaches such as IPD. Regular workshops, seminars, and training programmes on BIM, Lean practices, and IPD should be provided for public building construction stakeholders. Finally, the study contributed to the knowledge on IPD by highlighting the importance of stakeholder collaboration and other key success factors in the successful implementation of Integrated Project Delivery in public building projects in Anambra State.

Iconic Research and Engineering JournalsVol. 9(8)
Openalex Percentile: Top 45%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.