Multi-Objective Dynamic Scheduling in Cable Flexible Flow Shop Considering Energy Consumption and Reel-Splitting Constraints

Cable manufacturing is a typical hybrid production system characterized by the deep coupling of continuous processes and discrete logic. However, the unique “Reel-Splitting Constraint”—where continuous cables must be segmented into strictly sequenced sub-reels—along with high energy consumption and frequent dynamic disturbances render traditional Hybrid Flexible Flow Shop scheduling models ineffective in this context. To address these challenges, this paper proposes a novel Multi-Objective Dynamic Scheduling Framework tailored for the cable industry. First, a mathematical model is constructed that explicitly formalizes the rigid logic of sub-reel sequencing and continuous material flow, aiming to simultaneously minimize total energy consumption, makespan, and changeover times. Unlike generic models, this formulation introduces a constraint-handling mechanism to ensure the physical continuity of sub-reels during optimization. Second, a two-stage hybrid swarm intelligence algorithm is developed to solve this NP-hard problem. An improved Ant Colony Optimization (ACO) algorithm is employed for “population seeding” to generate feasible initial schedules and avoid deadlocks, while a Variable Neighborhood Search (VNS) executes deep evolutionary operations—such as setup reduction and critical operation insertion—to escape local optima. Case studies based on real-world industrial data demonstrate the superior performance of the proposed method. The hybrid strategy reduces the makespan by approximately 9.8% compared to traditional approaches and effectively mitigates energy waste in bottleneck processes. Furthermore, the proposed event-driven dynamic rescheduling mechanism exhibits exceptional responsiveness, reducing rescheduling time for unexpected equipment breakdowns from 18 h to 0.83 h, thereby enabling within-shift decision-making and robust operation in volatile manufacturing environments.

Authors

Institutions

Publication Details

Journal
Processes
Published
2026-02-27
DOI
https://doi.org/10.3390/pr14050769
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Objective Dynamic Scheduling in Cable Flexible Flow Shop Considering Energy Consumption and Reel-Splitting Constraints

Chongxin Wang, Zhenyu Yang, Z. NI, Changbiao Zhu
Processes
Scheduling and Optimization Algorithms
article

Multi-Objective Dynamic Scheduling in Cable Flexible Flow Shop Considering Energy Consumption and Reel-Splitting Constraints

Chongxin Wang, Zhenyu Yang, Z. NI, Changbiao Zhu
article en

Abstract

Cable manufacturing is a typical hybrid production system characterized by the deep coupling of continuous processes and discrete logic. However, the unique “Reel-Splitting Constraint”—where continuous cables must be segmented into strictly sequenced sub-reels—along with high energy consumption and frequent dynamic disturbances render traditional Hybrid Flexible Flow Shop scheduling models ineffective in this context. To address these challenges, this paper proposes a novel Multi-Objective Dynamic Scheduling Framework tailored for the cable industry. First, a mathematical model is constructed that explicitly formalizes the rigid logic of sub-reel sequencing and continuous material flow, aiming to simultaneously minimize total energy consumption, makespan, and changeover times. Unlike generic models, this formulation introduces a constraint-handling mechanism to ensure the physical continuity of sub-reels during optimization. Second, a two-stage hybrid swarm intelligence algorithm is developed to solve this NP-hard problem. An improved Ant Colony Optimization (ACO) algorithm is employed for “population seeding” to generate feasible initial schedules and avoid deadlocks, while a Variable Neighborhood Search (VNS) executes deep evolutionary operations—such as setup reduction and critical operation insertion—to escape local optima. Case studies based on real-world industrial data demonstrate the superior performance of the proposed method. The hybrid strategy reduces the makespan by approximately 9.8% compared to traditional approaches and effectively mitigates energy waste in bottleneck processes. Furthermore, the proposed event-driven dynamic rescheduling mechanism exhibits exceptional responsiveness, reducing rescheduling time for unexpected equipment breakdowns from 18 h to 0.83 h, thereby enabling within-shift decision-making and robust operation in volatile manufacturing environments.

ProcessesVol. 14(5)
Ministry of Education Science and Technology (MW), Southeast University (CN)
National Key Research and Development Program of China
Affordable and clean energy
Openalex Percentile: Top 45%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.