Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: a Malaysian case study

Purpose High-rise residential buildings face persistent maintenance inefficiencies due to reactive workflows, poor spatiotemporal integration, and suboptimal resource allocation. Current approaches inadequately address the complexities of vertical structures and dynamic maintenance requirements, creating critical gaps in proactive management. This study aims to bridge these gaps by developing and validating a 3D GIS-integrated rule-based scheduling model, enhancing proactive decision-making, resource optimisation, and regulatory compliance. Design/methodology/approach A 3D GIS-integrated rule-based scheduling model was developed, combining spatial visualisation, temporal analytics and Unified Modeling Language (UML) logic. A dataset of 4,070 maintenance work orders was collected from three high-rise residential buildings managed by a Malaysian university Asset Management Department (2020–2024). Data were digitised, modeled in SketchUp, integrated via ArcGIS Pro and PostgreSQL/PostGIS, and validated against manual scheduling. Findings The model reduced delays in high-priority tasks by 17%, improved compliance with task urgency by 23%, and achieved 100% technician utilisation. It also supported spatiotemporal fault visualisation, trend detection, and workload balancing. Lean maintenance principles and life cycle cost analysis were embedded, ensuring alignment with Malaysia’s Strata Management Act 2013. Practical implications The model offers facility managers, developers, and Management Corporation a scalable, data-driven tool for improving scheduling efficiency and regulatory compliance in high-rise maintenance operations. Originality/value This study uniquely integrates 3D Geographic Information Systems, temporal analytics, and rule-based logic into a unified scheduling framework. It moves beyond conventional systems by enabling dynamic prioritisation, proactive planning, and sustainability-focused maintenance. The model serves as a foundation for further integration with Internet of Things monitoring and smart city systems.

Authors

Institutions

Publication Details

Journal
Built Environment Project and Asset Management
Published
2026-02-26
DOI
https://doi.org/10.1108/bepam-04-2025-0111
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: a Malaysian case study

Suhaibah Azri, Usman Mehmood, Uznir Ujang
Built Environment Project and Asset Management
BIM and Construction Integration
article

Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: a Malaysian case study

Suhaibah Azri, Usman Mehmood, Uznir Ujang
article en

Abstract

Purpose High-rise residential buildings face persistent maintenance inefficiencies due to reactive workflows, poor spatiotemporal integration, and suboptimal resource allocation. Current approaches inadequately address the complexities of vertical structures and dynamic maintenance requirements, creating critical gaps in proactive management. This study aims to bridge these gaps by developing and validating a 3D GIS-integrated rule-based scheduling model, enhancing proactive decision-making, resource optimisation, and regulatory compliance. Design/methodology/approach A 3D GIS-integrated rule-based scheduling model was developed, combining spatial visualisation, temporal analytics and Unified Modeling Language (UML) logic. A dataset of 4,070 maintenance work orders was collected from three high-rise residential buildings managed by a Malaysian university Asset Management Department (2020–2024). Data were digitised, modeled in SketchUp, integrated via ArcGIS Pro and PostgreSQL/PostGIS, and validated against manual scheduling. Findings The model reduced delays in high-priority tasks by 17%, improved compliance with task urgency by 23%, and achieved 100% technician utilisation. It also supported spatiotemporal fault visualisation, trend detection, and workload balancing. Lean maintenance principles and life cycle cost analysis were embedded, ensuring alignment with Malaysia’s Strata Management Act 2013. Practical implications The model offers facility managers, developers, and Management Corporation a scalable, data-driven tool for improving scheduling efficiency and regulatory compliance in high-rise maintenance operations. Originality/value This study uniquely integrates 3D Geographic Information Systems, temporal analytics, and rule-based logic into a unified scheduling framework. It moves beyond conventional systems by enabling dynamic prioritisation, proactive planning, and sustainability-focused maintenance. The model serves as a foundation for further integration with Internet of Things monitoring and smart city systems.

Built Environment Project and Asset ManagementVol. 16(2)
University of Technology Malaysia (MY)
Responsible consumption and production
Openalex Percentile: Top 42%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.